My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/20/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
02/20/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:39:51 PM
Creation date
4/4/2018 2:55:49 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/20/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />TO: Jason E. Brown, <br />County Administrator <br />THROUGH: Richard B. Szpyrka, P.E., <br />Public Works Director <br />THROUGH: James D. Gray, Jr. M.S., <br />Natural Resources Manager <br />FROM: Kendra Cope, M.S., <br />Coastal Environmental Specialist <br />SUBJECT: Work Order No. 2018006-1 APTIM Environmental and Infrastructure, <br />Inc. <br />Sector 3 Beach Restoration Project <br />2018 Post Construction Sea Turtle Monitoring Services <br />DATE: February 9, 2018 <br />DESCRIPTION AND CONDITIONS <br />On January 9, 2018 the Board approved a contract with APTIM Environmental and Infrastructure, <br />Inc. (APTIM) for professional coastal engineering and biological support services related to the <br />management and renourishment of the Sector 3 (Wabasso Beach) beach project area. Ecological <br />Associates Inc., (EAI) is APTIMs Sub -Consultant for sea turtle related monitoring. <br />The proposed Work Order No. 2018006-1 provides year 2018 post construction biological <br />monitoring services relative to sea turtle monitoring and reporting of the Sector 3 Beach <br />Restoration and Sector 3 Dune Repair Project Area. By Permit, annual Post Construction <br />Biological monitoring is required following a large scale beach restoration project. The 2018 <br />monitoring entails the following: <br />• "Year 3" post construction monitoring <br />Work Order No. 2018006-1 totals a lump sum amount of $131,824.77 <br />All subsequent annual biological monitoring of the Sector 3 Project area will be addressed <br />through future work orders. <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF <br />8\@BCL@4CODCC6B\@BCL@4CODCC6B.docx 126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.