My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-063A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-063A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:11:50 AM
Creation date
4/9/2018 2:07:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/03/2018
Control Number
2018-063A
Agenda Item Number
8.G.
Entity Name
Environmental Science Associates
Subject
Jungle Trail Shoreline Stablization
Project Number
Work Order Number 3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4 — Permit Application <br />,ESA shall investigate whether the original permit can be modified; or if this project would be <br />exempt underthe EFO. If these isn'tfeasible, then ESA will prepare a State-wide Environmental <br />Resource Permit (SWERP) application and submit a draft copy for County to review. The permit <br />application will also include supporting documents including signed and sealed design plans, <br />signed and sealed topographic & bathymetric survey and permit figures. Upon approval, ESA will <br />require signatures from the County as owner and applicant. ESA will submit the permit <br />electronically to the Florida Department of Environmental Protection (FDEP) and the U.S. Army <br />Corps of Engineers (USACE). ESA will provide payment of the permit fees through the electronic <br />system to the FDEP at the time of permit application submittal with reimbursement by the <br />County. ESA has prepared for one round of requests for additional information (RAI) from the <br />regulatory agencies. If additional RAls are issued, ESA will discuss the level of effort required to <br />respond to the agencies with the County. <br />Task 5 — Final Design, Specifications & Bidding Documents <br />Final Design Plans and Specifications will be prepared including conditions from the FDEP and <br />USACE permits. Final Design Plans will be 24"x 36" in size, include detail drawings and will serve <br />as the basis for the contract drawings in the final package sent to prospective bidders, by the <br />County. Drawings will include the bathymetric and topographic survey, contour charts, cross- <br />sections, project staging areas and the construction access corridor(s). ESA shall prepare <br />technical specifications to support the final plan set including geotextile material performance <br />criteria, rock density and placement requirements. <br />Submittals will be provided to the County for review and comment. ESA shall revise any changes <br />promptly and shall furnish the final drawings copies suitable for distribution to prospective <br />bidders. <br />ESA will coordinate with the County with the development of the Contract Documents and make <br />a recommendation of award. Final cost estimates will be provided as well as a bid form, which <br />will include a detailed estimate of the quantities and work to be performed. Components of the <br />Contract Documents that will be provided include the following: <br />• Construction Plan Set <br />• Technical Specifications <br />• Appendix Information (Permits, aerial photography, and any other relevant <br />information). <br />The County will coordinate the bid advertisement with ESA to determine an appropriate date for <br />a Pre -Bid Meeting. ESA will prepare for and attend the meeting, and answer prospective <br />Contractor inquiries ortranscribe Contractor inquiries for subsequent research and respond to all <br />meeting attendees as appropriate. <br />During the bidding period, ESA shall communicate frequently with County staff regarding receipt <br />of prospective Contractor written inquiries seeking interpretation of the Contract Documents. <br />Should ESA and the County receive such information within the stipulated time in advance of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.