My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-063B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-063B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:12:44 AM
Creation date
4/9/2018 3:02:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/03/2018
Control Number
2018-063B
Agenda Item Number
8.H.
Entity Name
Aptim Environmental and Infrastructure, Inc.
Subject
Wabasso Beach and Dune Restoration Project
Design and Permitting Services
Work Order Number 2
Area
Sector 3 (Wabasso Beach)
Project Number
2018006-2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1 <br />APTIM <br />March 14, 2018 (revised from March 8, 2018) <br />Mr. James Gray <br />Indian River County <br />Public Works - Coastal Engineering Division <br />1801 27th St, Building A <br />Vero Beach, FL 32960 <br />Subject: Indian River County, FL <br />Sector 3 — 2018006 — Work Order #2 <br />Design and Permitting <br />Dear James: <br />Aptim Environmental & Infrastructure, Inc. <br />2481 NW Boca Raton Blvd. <br />Boca Raton, FL 33431 <br />Tel: +1 561 391 8102 <br />Fax: +1 561 391 9116 <br />www.aptim.com <br />This proposal outlines a scope of work for Aptim Environmental & Infrastructure, Inc. (APTIM) to provide <br />professional services to Indian River County (the County) in support of design and permitting efforts for the Sector <br />3 (Wabasso Beach) Beach and Dune Renourishment Project. 'The initial Sector 3 project was completed in three <br />phases between 2010 and 2012, and authorized under FDEP Joint Coastal Permit No. 0285993 -001 -JC. Following <br />damages due to Hurricane Sandy in 2012, a dune repair project was constructed in the winter of 2014/15, <br />authorized under Modification 008 -JN of the original permit. Authorization for construction activity under the <br />original permit has since expired. The Sector 3 shoreline has recently experienced significant erosion of the beach <br />berm and dune, most notably from impacts of Hurricane Matthew in October 2016 and Hurricane Irma in <br />September 2017. As directed from the most recent update of the County's Beach Preservation Plan (2015), the <br />Sector 3 shoreline is to be managed with the "beach fill" strategy. As such, there is a need for renourishment of <br />the Sector 3 shoreline to maintain protection to upland properties and infrastructure. This proposal outlines a <br />scope of work to support the County in developing a beach renourishment project in Sector 3. The work is broken <br />up into eight separate Tasks. Each cost was developed following the provisions of the Professional Services <br />Agreement between Indian River County and APTIM, dated January 9, 2018, to provide engineering and biological <br />support services for the Sector 3 (Wabasso Beach) Beach and Dune Renourishment Project (RFQ#2018006). <br />Task 1: Preliminary Project Design and Feasibility Report <br />Task 2: Pre -Application Meetings and Coordination <br />Task 3: Supplemental Environmental Assessment <br />Task 4: Permit Applications <br />Task 5: Response to RAI <br />Task 6: Construction Plans and Specifications <br />Task 7: Geotechnical Evaluation and Compatibility Analysis <br />Task 8: Multibeam Bathymetric Survey of South Borrow Area <br />Each Task is described on the following pages... <br />Proj.#631235714 <br />
The URL can be used to link to this page
Your browser does not support the video tag.