,oAPTIM <br />Task 1: Preliminary Project Design and Feasibility Report <br />March 14, 2018 <br />Page 2 of 10 <br />Task 1: Scope of Work <br />As the basis for the initial design and permitting effort, APTIM will utilize the most recent beach survey data <br />collected by the County's surveyor (winter 2018 survey). Shoreline and volume changes will be updated to <br />evaluate trends and hot spots of the existing beach conditions. Fill templates previously utilized for the initial <br />Sector 3 project and the dune repair project will be evaluated to investigate their appropriateness for the <br />proposed renourishment project. Development of the alongshore distribution of the fill will consider previous <br />project performance and recently observed shoreline and volume change trends and hot spots. The proposed <br />design will have a specific focus on minimizing the potential for adverse impacts to the hardbottom resources <br />nearshore of the project ("no -impact design"). A cross -shore equilibrium profile analysis of the recommended <br />design will be conducted to evaluate the potential for hardbottom impacts. <br />Sand sources, both offshore and upland, will be preliminarily evaluated to be utilized for fill material. These <br />sources will be evaluated based on beach compatibility and cost. The sand source evaluation will be included as <br />an Appendix, and summarized in the main text. <br />The recommended design, requiredcfill volume, and proposed sand sources will be used to estimate construction <br />costs and timeline. Recommendations to move forward with the project, as designed, will be included in the <br />report. <br />Task 1: Deliverable <br />APTIM will provide the County an electronic version of the draft Feasibility Report for the County's review and <br />comments. Once finalized, APTIM will provide the County one hardcopy and one electronic version of the final <br />feasibility report. The final version will be included as an attachment in the State and Federal permit applications. <br />Task 1: Schedule <br />This task will begin upon approval from the County to proceed with this work order. It is anticipated that 75 days <br />will be required to complete the analysis and compose a feasibility report documenting the findings. At such time, <br />a draft report will be provided to the County for its review and comments. Once the comments are returned to <br />APTIM, the final report addressing the comments will be submitted to the County within 15 days. <br />Task 1: Cost <br />The lump sum cost for this task is $38,979.00. <br />Task 2: Pre -Application Meetings and Coordination <br />Task 2: Scope of Work <br />We will request, prepare for, and lead two separate pre -application meetings with regulatory staff of 1) the Florida <br />Department of Environmental Protection (FDEP) and 2) US Army Corps of Engineers (USACE) and Federal <br />Sector 3 — 2018006 — WO#2: Design and Permitting Proj. #631235714 <br />