My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/03/2018
CBCC
>
Meetings
>
2010's
>
2018
>
04/03/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:07:46 PM
Creation date
4/17/2018 5:18:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/03/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY FLORIDA F6 <br />BOARD MEMORANDUM • • >, ► e ► • e <br />TO: <br />Jason E. Brown <br />County Administrator <br />THROUGH: <br />Richard B. Szpyrka, P.E. <br />Public Works Director <br />FROM: <br />James D. Gray, Jr. <br />Natural Resources Manager <br />SUBJECT: <br />Work Order No. 3 Environmental Science Associates <br />Jungle Trail Shoreline Stabilization Project <br />DATE: March 22, 2018 <br />BACKGROUND <br />Jungle Trail Road is an unpaved roadway along the eastern shoreline of the Indian River Lagoon <br />that is maintained by Indian River County. Recently, staff observed that portions of a roadway <br />are within 5 feet of the Atlantic Intracoastal Waterway and is in need of stabilization to protect <br />the roadway from additional erosion. The destabilization of the roadway is largely attributable <br />to impacts from vessel wakes using the adjacent waterway. Similar erosion along the shoreline <br />of Jungle Trail Road occurred in the early 2000s that necessitated the construction of a roadway <br />stabilization project in 2006. <br />DESCRIPTION AND CONDITIONS <br />On October 10, 2017, the Board approved a contract with Environmental Science Associates <br />(ESA) for professional continuing environmental and biological support services for engineering <br />projects for a two year term, through October 10, 2019. ESA is the selected consultant for <br />professional environmental engineering services related to the Jungle Trail Shoreline <br />Stabilization Project. <br />The proposed Work Order No. 3 provides professional environmental engineering services to <br />design and permit a stabilization project along approximately 500 linear feet of Jungle Trail <br />Road. Specifically, the project area is located immediately south and adjacent to the 2006 <br />stabilization project near the Sea Oaks Development and channel marker 89. <br />Work Order No. 3 includes five (5) separate tasks for a lump sum amount of $53,228. <br />ESA Work Order No. 3 216 <br />C:\Users\legistar\AppDaia\Local\Temp\BCL Technologies\easyPDF 8\@BCL@240EF4C2\@BCL@240EF4C2.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.