My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/03/2018
CBCC
>
Meetings
>
2010's
>
2018
>
04/03/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:07:46 PM
Creation date
4/17/2018 5:18:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/03/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br />,oAPTIM <br />Summary of Cost <br />$ 38,979.00 <br />Task 1: Preliminary Project Design and Feasibility Report <br />$ 15,650.00 <br />Task 2: Pre -Application Meetings and Coordination <br />$ 19,337.00 <br />Task 3:.Supplemental Environmental Assessment <br />$ 61,926.00 <br />Task 4: Permit Applications <br />$ 33,512.00 <br />Task 5: Response to RAI <br />$ 26,943.00 <br />Task 6: Construction Plans and Specifications <br />$ 22,752.00 <br />Task 7: Geotechnical Evaluation and Compatibility Analysis <br />$ 39,390.00 <br />Task 8: Multibeam Bathymetric Survey of South Borrow Area <br />March 14, 2018 <br />Page 10 of 10 <br />$258,489.00 Total lump sum cost to perform the proposed work for Sector 3 — 2018006 — Work Order #2 <br />APTIM will proceed with developing the project design and permitting of the project upon receipt of a work order <br />from Indian River County. It is noted that many aspects of the project permitting are dependent upon agency <br />review and outside the control of APTIM and the County. As such, the schedule described herein is provided as a <br />guideline. APTIM will strive to maintain the schedule and costs as reasonably as can be expected. We will <br />coordinate with the County if deviations from the schedule or costs arise due to unforeseen issues or <br />circumstances. <br />Thank you for the opportunity to serve Indian River County. We look forward to continuing to provide successful <br />professional services to the County. Please do not hesitate to call if you have any questions. <br />Sincerely, <br />William Reilly, P.E. <br />Senior Coastal Engineer <br />Aptim Environmental & Infrastructure, Inc. <br />Enclosure <br />cc: Thomas Pierro, P.E., D.CE, APTIM <br />Stacy Buck, APTIM <br />Debbie Neese, APTIM <br />/ <br />Sector 3 — 2018006 — WO#2: Design and Permitting <br />Approved for use s v email dated 3/8/1018 <br />Approved revisions via phone 3/14/2018 <br />Authorized Corporate Signature <br />Thomas P. Pierro, P.E., D.CE <br />Printed Name <br />Director of Operations <br />Title <br />Proj. 4631235714 <br />236 <br />
The URL can be used to link to this page
Your browser does not support the video tag.