Laserfiche WebLink
EXHIBIT 2 <br />SPM REVISION: 63 2 2018. REV 18.1 j <br />PROJECT NUMBER: 611235714 � <br />'v5 <br />.a APTIM <br />t3 Sector 3 - 2018006 Work .Order #2 <br />Design and Permitting <br />Indian River County, FL <br />Summary of Cost by Task <br />Task Number Task Name Labor Sub- Equipment Materials Mobilization/ Totals <br />Contractors Travel <br />Task 1 <br />Preliminary Project Design and <br />$ 38 979.00 <br />$ <br />$ <br />$ <br />$ <br />$ 38,979.00 <br />Feasibility Report <br />Task 2 <br />Pre -Application Meetings and <br />$ 15,650.00 <br />$ <br />$ <br />$ <br />$ <br />$ 15,650.00 <br />Coordination <br />Task 3 <br />Supplemental Environmental <br />$ 19,337.00 <br />$ <br />$ <br />$ <br />$ <br />E 19,337.00 <br />Assessment <br />Task <br />Permit Applications <br />$ 61,926.00 <br />$ <br />$ <br />$ <br />$ <br />$ 61,926.00 <br />Task 5 <br />Response to RAI <br />$ 33,512.00 <br />$ <br />$ <br />$ <br />$ <br />$ 33,512.00 <br />Task 6 <br />Construction Pians and <br />$ 26,943.00 <br />$ <br />$ <br />$ <br />$ <br />$ 26,943.00 <br />Specifications <br />Task 7 <br />Geotechnical Evaluation and <br />$ 22,752.00 <br />$ - <br />$ <br />$ <br />$ <br />$ 22,762.00 <br />Compatibility Analysis <br />Task 8 <br />Multibeam Sathymetdc Survey of <br />$ 27.052.00 <br />$ - <br />$ 9,842.00 <br />$ <br />2,496.00 <br />$ 39,390.00 <br />South Borrow Area$ <br />Totals = <br />$ 246,151.00 <br />$ <br />$ 9,842.00 <br />$ <br />$ 2,496.00 <br />$ 258,489.00 <br />Submitted By: William Reilly <br />Submitted To: Indian River County, FL <br />Submission Date: 3/14/2018 <br />237 <br />