Laserfiche WebLink
SECTION 00800 --SUPPLEMENTARY CONDITIONS TO THE:' <br />GENERAL CONDITIONS <br />SC4.00 Introduction <br />These. Supplementary Condiions amend or supplement the Standard General Conditions 'of -the <br />Construction Contract (No. --1910-8,.1996 Edition) and . other provisions of the Contract <br />Documents as indicated. below. All provisions, which are not so -amended or supplemented, <br />remain in full force and effect. <br />The terms used in these Supplementary Conditions will have the .meanings indicated in the <br />General Conditions. <br />SC4.01 Defined Terms <br />SC -1.01.A.20. Delete paragraph GC 1.01.A.20 in its entirety. <br />SC -1.02 . Terminology <br />SC -1.02.D.1, 2, and 3 Delete paragraphs GC -1.02.D.1, 2, and 3 in their entirety and <br />insert the following paragraphs in their place: <br />D. Furnish, Install, Perform, Provide <br />1. The word "furnish" shall mean to supply and deliver services, materials, or <br />equipment to the Site (or some other specified location) ready for use or <br />installation and in usable or operable condition. <br />2. The word "install" shall mean to put into use or place in final position services, <br />materials, or equipment complete and ready for intended use. <br />3. The words "perform" or "provide" shall mean to furnish and install services, <br />materials, or equipment complete and ready for intended use. <br />SC -2.05 Before Starting Construction <br />SC -2.05:C. Delete paragraph GC 2.05.0 in its entirety and insert the following paragraph in its <br />place: <br />C. Evidence of Insurance: CONTRACTOR shall not commence work under this <br />Contract until he has obtained all insurance required under Article 5 and such <br />insurance has been delivered to the OWNER and approved by the OWNER, nor <br />shall the CONTRACTOR allow any Subcontractor to commence work on his <br />subcontract until all similar insurance required of the Subcontractor has been- so <br />obtained and approved. All such insurance shall remain in effect until final <br />payment and at all times thereafter when CONTRACTOR may be correcting, <br />removing or replacing defective Work in accordance with Article 13. <br />SC -2.06 Preconstruction Conference <br />SC -2.06 Delete paragraph GG2.06.A in. its entirety and insert the following paragraph in its <br />place:::.. <br />A.- Immediately after awarding the contract, but before the CONTRACTOR begins <br />work, the Project Madaderr will calla preconstruction conference at..a place the <br />ENGINEER nde <br />designates to' establish.an urstanding among :the partiesas to <br />the work and to' discuss schedules referred.. -to in'. paragraph 2-.05."%.;procedures <br />00800-1 <br />OQ800 -.Supplementary Condlfions 05-13 rev <br />008001 F-4ub WftWENGINEERING DMSION PROJEC7MI735 IRC AM Compau Roos R%ga E Repair M*cA1a1dnnUW Docume tWlaster Cwhad <br />OodanerdsW0800 - Supplementary Conditions 0543 revdoc . ' <br />