My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for"handling. Shop Drawings and other submittals,' and maintaining required..., <br />records. Utility companies and others as appropriate will lie requested .to attend • . <br />to discuss and coordinate work: <br />B. The Contractor will certify to the Engineer the.following: <br />1. A. listing of on-site clerical staff, supervisory. personnel and their pro=rated <br />time assigned to the contract, <br />2. Actual Rate for items'listed in Table 4-3.2.1 (see below), <br />3. Existerice of employee, benefit. plan for Holiday; Sick and Vacation benefits <br />and a Retirement Plan, and, <br />.4. Payment of Per. Diem - is a company practice for instances when <br />compensation for Per. Diem is requested. <br />Such certification must be madeby. an officer or director of the Contractor with - <br />authodty to bind the Contractor. Timely certification is a condition precedent to <br />any right of the Contractor to recover compensations for such costs, and failure <br />to timely submit the certification will constitute a full, complete, absolute and <br />irrevocable waiver by the Contractor of any right to recover such costs. Any <br />subsequent changes shall be certified to the Engineer as part of the cost <br />proposal or seven calendar days in advance of performing such extra worts <br />FDOT Table <br />4-3.2.1 <br />Item <br />Rate <br />FICA <br />Rate established by Law <br />FUTA/SUTA <br />Rate established by Law <br />Medical Insurance <br />Actual <br />Holidays, Sick & Vacation Benefits <br />Actual <br />Retirement Benefits <br />Actual <br />Workers Compensation <br />Rates based on the National Council on <br />Compensation Insurance basic rates tables <br />adjusted by Contractor's actual experience <br />modification factor in effect at the time of the <br />additional work or unforeseen work <br />Per Diem <br />Actual but not to exceed State of Florida's rate <br />Insurance" <br />Actual <br />"Compensation for -Insurance is limited solely to General Liability Coverage and does not include any other <br />insurance coverage (such as, but not limited to, Umbrella Coverage, Automobile Insurance, etc.). <br />SC -3.06 Coordination of Plans, Specifications, and Special Provisions <br />SC -3.06 Add the following new paragraphs immediately after paragraph GC -3.05: <br />SC -3.06 Coordination of Plans, Specifications, and Special Provisions <br />A. In case of discrepancy, the governing order of the documents shall be as follows: <br />1. Written Interpretations <br />.2. Addenda <br />3: Specifications <br />4. Supplementary Conditions to the General Conditions <br />5. General Conditions <br />6_- Approved Shop Drawings. <br />7... . Drawings <br />8. `Referenced Standards. <br />B. Written/co'nputed dimensions shall govern over scaled dimensions. . <br />- 00800-2 <br />00800 Supplementary Conditions 05-13 rev. <br />00800 2F.MNM1c WbftkENGINEERMG DIVISION PROJECTSM735 IRC -AH Cmpex Rohr Replacement -Rep* Projecxll Adminl8id DocumerbWaster Contract <br />Dooms ntMOOSM-.Suppjementwjr.Cory tiftm05-13rev.doc.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.