My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. City[County building permit application -Permit no. XXXXXXXXX <br />2. The CONTRACTOR shall obtain and pay for.all other required permits, and . <br />licenses. The CONTRACTOR shall. provide copies of the permits to the <br />OWNER and ENGMEER and shall comply with'all conditions contained in - <br />the permits at no. extra cost to the OWNER.. <br />3. .'The CONTRACTOR shall be familiar with all permit requirements during. <br />construction and shall be responsible for complying.with these <br />requirements. The cost of this effort shall be included in the pay item in <br />which the work -is most closely associated with. <br />SC41.01' Cost of the Work <br />SC -11.01:A 1.. Delete paragraph GC -11.01.A.1 in its entirety, and.insert the following sentences <br />in its place: <br />1. CONTRACTOR will receive payment for actual costs of direct labor and burden <br />(see SC -2.06.13) for the additional or unforeseen work. Labor includes foremen <br />actually engaged in the work; and will not include project supervisory personnel nor <br />necessary on-site clerical staff, except when the additional or unforeseen work is a <br />controlling work item and the performance of such controlling work item actually <br />extends completion of the project due to no fault of the Contractor. Compensation <br />for project supervisory personnel, but in no case higher than a Project Manager's <br />position, shall only be for the pro -rata time such supervisory personnel spent on <br />the contract In no case shall an officer or director of the Company, nor those <br />persons who own more than 1 %. of the Company, be - considered as project <br />supervisory personnel, direct labor or foremen hereunder. The expenses of <br />performing Work outside of regular working hours, on Saturday, Sunday, or legal <br />holidays, shall be included in the above to the extent authorized by OWNER. <br />SC -13.03 Test and Inspections <br />SC -13.03.13. Delete paragraph GG -13.03.B in its entirety, and insert the following sentences in <br />its place: <br />- B - OWNER shall employ and pay for the services of -an- independent testing laboratoryto.- ._ . <br />perform all initial inspections, tests, or approvals required by the Contract Documents <br />except those inspections, tests, or approvals listed immediately below. Subsequent <br />inspections, tests, or approvals .required after initial failing inspections, tests, or <br />approvals: shall be paid for by the CONTRACTOR by back charge to subsequent <br />applications for payment. The CONTRACTOR shall arrange, obtain, and pay for the <br />following inspections, tests, or approvals: <br />1. inspections, tests, or approvals covered by paragraphs 13.03.0 and 1.3.03.1 <br />below; <br />2. costs incurred in connection with tests or inspections conducted pursuant to <br />paragraph 13.04.13 shall be paid as provided in said paragraph 13.04.13; <br />3. _ tests otherwise. specifically provided in the Contract Documents. <br />SC43.05 OWNER May:Stop the Work <br />00800-7 .. <br />00800 - Supplementary Conditions 05-13 rev <br />00800 7F:tPuw Wmks\ENGINEERING DMSION PROJECTSN735 IRC'Jail Compex Roof Replacemard- Repair Project\1 Adrtdn%Bid DoairteMsWlaster Connect' . <br />Dom meet vmw = supplementary COnddione 05-13 rev.doc - <br />
The URL can be used to link to this page
Your browser does not support the video tag.