Laserfiche WebLink
SC -13.05.A.' Delete paragraph OC -13.05.A in.its entirety and insert. the following paragraph. in its <br />place: <br />A. If the. Work is defective,- or CONTRACTOR fails to. supply ,sufficient skilled <br />workers or suitable materials or equipment, `6r. fails to comply with permit <br />requirements," or fails to comply with the technical. specifications, or fails. to <br />perform the Work in such. a way that the completed Work will conform to. the . <br />Contract Documents, OWNER may order CONTRACTOR to stop the Work, or any <br />:. portion thereof, until the -cause for such order has been eliminated; however,: this <br />right of OWNER to stop.the Work shall not give rise to any dutyon the part of <br />OWNER to exercise this right for the benefit of CONTRACTOR, any, <br />Subcontractor, any Supplier, any other individual or .entity, or any surety for, or <br />employee or agent of any of them. <br />SC -13.07 Correction Period J <br />SC -13.07 A-. Delete the first sentence of paragraph GG -13.07.A in its entirety and insert the <br />following sentence in its place <br />A. If within one year after the date of Final Completion or such longer period of time <br />as may be prescribed by Laws or Regulations or by the terms of any. applicable <br />special guarantee required by the Contract Documents or by any specific provision <br />of the Contract Documents, any Work is found to be defective, or if the repair of <br />any damages to the land or areas made available for CONTRACTOR's use by <br />OWNER or permitted by Laws and Regulations as contemplated in paragraph <br />6.11.A is found to be defective, CONTRACTOR shall promptly, without cost to <br />OWNER and in accordance with OWNER's written instructions: (i) repair such <br />defective land or areas, or (ii) correct such defective Work or, if the defective Work <br />has been rejected by OWNER, remove it from the Project and replace it with Work <br />that is not defective, and (iii) satisfactorily correct or repair or remove and replace <br />any damage to other Work, to the work of others or other land or areas resulting <br />therefrom. <br />SC -13.07 B. Delete paragraph GC -13.07.B in its entirety and insert the following sentence in its <br />place <br />B. In special circumstances where a particular item of equipment is placed in continu- <br />ous service before Final Completion of all the Work, the correction period for that <br />item may start to run from an earlier date if so provided in the Specifications or by <br />Written Amendment. <br />