SECTION 01009 <br />SPECIAL PROVISIONS <br />1.1 GENERAL <br />A. The following are Special Provisions for Work at the IRC Jail Complex: <br />1. Contractor must successfully pass a background check prior to authorization to <br />work on the premises. Background must reveal no active warrants or be out on <br />bond. Criminal history will be evaluated on a case by case basis. <br />2. Contractor once approved, will be issued a site badge and he or she must check <br />in with the Site Supervisor or designee at the beginning and end of each <br />workday. <br />3. Contractor will complete a tool inventory at the beginning and end of each <br />workday. Security deputy assigned to the detail for that day will verify tool <br />inventory. Approximately 30 minutes.daily to conduct tool inventory. <br />4. Contractor will have no communication with incarcerated persons unless <br />approved by security deputy. Any violation of this rule will be grounds for having <br />site badge revoked. <br />5. All work will be completed during normal business hours 8 am -5 pm. A minimum <br />of 48 hours notice must be given to Site Supervisor or designee when project <br />work will interfere with facility operations. <br />6. Contractor will provide a project supervisor to be present anytime work is being <br />completed. <br />7. Indian River County Sheriffs Office will have a supervisor available anytime <br />project work is being performed. <br />B. Visits to the construction site may be made by representatives of permitting or <br />governing bodies. Submit details of all instructions from the above to the ENGINEER <br />immediately. The Work will not be accepted by the OWNER until final acceptance has <br />been received from the various Regulatory Agencies having jurisdiction. <br />C Furnish sufficient labor, construction equipment and materials, and work such hours, <br />including night shifts and overtime operations, as may be necessary to insure the <br />prosecution of the work in accordance with the approved progress schedule. If, in the <br />opinion of the ENGINEER, the CONTRACTOR falls behind the progress schedule, take <br />such steps as may be necessary to improve progress, all without additional cost to the <br />OWNER. The ENGINEER shall be compensated for his overtime services in <br />accordance with the Supplementary Conditions, SC -6.02. <br />01009-1 01009 -Special Provisions <br />F:\PubIicWorks\ENGINEERING DIVISION PROJECTS\1735 IRC Jail Compex Roof Replacement -Repair Project\1-Admin\Bid DocumentsWaster Contract <br />Documents\01009 - Special Provisions.doc <br />