My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOFING REPLACEMENT, RECOVER AND REPAIR PROJECT PAGE 3 <br />INDIAN RIVER COUNTY — JAIL COMPLEX SECTION 024119 <br />JANUARY 4, 2018 SELECTIVE DEMOLITION <br />3.2 UTILITY SERVICES AND MECHANICAUELECTRICAL SYSTEMS <br />A. Existing .Services/Systems to Remain: Maintain services/systems indicated to remain <br />and protect them against damage. <br />Comply with requirements for existing services/systems interruptions specified in <br />the Division 1 Documents. <br />B. Existing Services/Systems to Be Removed, Relocated, or. Abandoned: Locate, <br />identify, disconnect, and seal or cap off indicated utility services and <br />mechanical/electrical systems serving areas to be selectively demolished. <br />1. Arrange to shut off indicated utilities with utility companies. <br />2. If services/systems are'required to be removed, relocated, or abandoned, <br />provide temporary services/systems that bypass area of selective demolition and <br />that maintain continuity of services/systems to other parts of building. <br />3. -Disconnect, demolish,, and remove fire -suppression systems, plumbing, and <br />HVAC systems, equipment, and components indicated to be removed. <br />a. Piping to Be Removed: Remove portion of piping indicated to be removed <br />and cap or plug remaining piping with same or compatible piping material. <br />b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with <br />same or compatible piping material. <br />c.. Equipment to Be Removed: . Disconnect and cap services and remove <br />equipment. <br />d. Equipment to Be Removed and Reinstalled: Disconnect and cap services <br />and remove, clean, and store ,equipment; when appropriate, reinstall, <br />reconnect, and make equipment operational. <br />e. Equipment to Be Removed and Salvaged: Disconnect and cap services <br />and remove equipment and deliver to Owner. <br />f. Ducts to Be Removed: Remove portion of ducts indicated to be removed <br />and plug remaining ducts with same or compatible ductwork material. <br />g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or <br />compatible ductwork material. <br />3.3 PREPARATION <br />A. Site Access and Temporary Controls: Conduct selective demolition and debris - <br />removal operations to ensure minimum interference with roads, streets, walks, <br />walkways, and other adjacent occupied and used facilities. <br />1. Comply with requirements for access.and protection specified in Owner provided <br />Division 1 documents., <br />B. Temporary Facilities: Provide temporary barricades and other protection required to <br />prevent injury to people and damage to adjacent buildings and facilities to remain. <br />C. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as <br />required to preserve stability and prevent movement, settlement, or collapse of <br />
The URL can be used to link to this page
Your browser does not support the video tag.