My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOFING REPLACEMENT, RECOVER AND REPAIR PROJECT PAGE 4 <br />INDIAN RIVER COUNTY — JAIL COMPLEX SECTION 024119 <br />JANUARY 4, 2018 SELECTIVE DEMOLITION <br />construction and finishes to remain, and to prevent unexpected or uncontrolled <br />movement or collapse of construction being demolished. <br />3.4 SELECTIVE DEMOLITION, GENERAL <br />A. General: Demolish and remove existing construction only to the extent required by <br />new construction and as indicated. Use methods required to complete the Work within <br />limitations of governing regulations and as follows: <br />1. Neatly cut openings and holes plumb, square, and true to dimensions required. <br />Use cutting methods least likely to damage construction to remain or adjoining <br />construction. Use hand tools or small power tools designed for sawing or <br />grinding, not hammering and chopping, to minimize disturbance of adjacent <br />surfaces. Temporarily cover openings to remain. <br />2. Cut or drill from the exposed or finished side into concealed surfaces to avoid <br />marring existing finished surfaces. <br />3. Do not use cutting torches until work area is cleared of,flammable materials. At <br />concealed spaces, such as duct and pipe interiors, verify condition and contents <br />of hidden space before starting flame -cutting operations. Maintain fire watch and <br />portable fire -suppression devices during flame -cutting operations. <br />4. Locate selective demolition equipment and remove debris and materials so as <br />not to impose excessive loads on supporting walls, floors, or framing. <br />5. Dispose of demolished items and materials promptly. <br />B. Removed and Reinstalled Items:. <br />1. Clean and repair items to functional condition adequate for intended reuse. <br />2. Protect items from damage during transport and storage. <br />3. Reinstall items in locations indicated. Comply with installation requirements for <br />new materials and equipment. Provide connections, supports, and <br />miscellaneous materials necessary to make item functional for use indicated. <br />C. Existing Items to Remain: Protect construction indicated to remain against damage <br />and soiling during selective demolition. When permitted by Architect, items may be <br />removed to a suitable, protected storage location during selective demolition and <br />cleaned and reinstalled in their original locations after selective demolition operations <br />are complete. <br />3.5 DISPOSAL OF DEMOLISHED MATERIALS <br />A. General: Except for items or materials indicated to be reused, salvaged, reinstalled, or <br />otherwise indicated to remain Owner's property, remove demolished. materials from <br />Project site and legally dispose of them in an EPA -approved landfill. <br />1. Do not allow demolished materials to accumulate on-site. <br />2. Remove and transport debris in a manner that will prevent spillage on adjacent <br />surfaces and areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.