My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOFING REPLACEMENT, RECOVER AND REPAIR PROJECT <br />INDIAN RIVER COUNTY = JAIL COMPLEX <br />JANUARY 4, 2018 <br />PAGE 8 <br />SECTION 075620 <br />GUTTER WATERPROOFING <br />f i 94 <br />G <br />,i01 <br />wg"pra- <br />NOR <br />Sikalastic 621 TC (Decothane <br />20 <br />70-75 <br />SP <br />*Note: Coverage. rates include a reasonable amount of wastage. Rough <br />and textured substrates can significantly affect coverage rates. <br />1. The base embedrhent coat shall be applied to all horizontal and vertical surfaces <br />by 1/2" - 3/4„ nap roller, brush or airless spray to achieve minimum wet film thicknesses <br />as specified above. <br />2. While the base embedment coat is still wet, immediately lay precut lengths of <br />conformable reinforcing scrim (Sika Reemat) into the wet base embedment coat, and <br />using a short nap roller with the appropriate roller frame and handle, roll the scrim to <br />force the wet coating up through the scrim to achieve full saturation and embedment. <br />Add additional material, if necessary, to ensure that the mesh is fully saturated and <br />fully conformed to the substrate without any visible pinholes. <br />3. Minimum. overlap of the reinforcement mesh shall be 2" in all directions. <br />Reinforcement shall turn up all adjacent wall surfaces, etc., until the termination point is <br />accomplished according to the project details and specifications. Membrane <br />terminations should be finalized prior to project start-up and documented in shop <br />drawings, but in general, terminations should occur in raked out mortar joints, saw cut <br />terminations, and where feasible, under installed counter -flashing materials. Tape <br />lines should always be used to achieve a straight and professional looking edge detail. <br />4. Allow the base embedment coat to cure and dry prior to the next application <br />procedure. <br />5. . Apply top coat by nap roller, brush or airless spray to achieve minimum wet film <br />thicknesses, as specified in table above. <br />6. Allow the top coat to cure and dry prior to the next application procedure. <br />3.05 WATER TEST <br />A. Water test.the gutter by means of ponded water to the gutter depth for a period of <br />4 hours to check the integrity of the membrane installation. <br />B. Verify that the structure can support the deadload weight of a water test before <br />testing. <br />C. If leaks should occur, the water must be drained completely and the membrane <br />installation repaired. The repaired area should then be retested per the procedures <br />specified in section A above. <br />3.06 ROOF PROTECTION <br />A. Protect all partially and fully completed waterproofing work from other trades until <br />completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.