My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOFING REPLACEMENT, RECOVER AND REPAIR PROJECT PAGE 9 <br />INDIAN RIVER COUNTY - JAIL COMPLEX SECTION 075620 <br />JANUARY 4, 2018 GUTTER WATERPROOFING <br />B. Whenever possible, stage materials in such a manner that foot traffic is <br />minimized over completed roof areas. <br />C. When it is not possible to stage materials away from locations where partial or <br />complete installation has taken place, temporary walkways and platforms . shall be <br />installed in order to protect all completed roof areas from traffic and point loading during <br />the application process. <br />D. Temporary tie-ins shall be installed at the end of each workday and removed <br />r <br />prior to commencement of work the following day. <br />3.07 CLEAN-UP <br />A. All work areas are to be kept clean, clear and free of debris at all times. <br />B. Do not allow trash, waste, or debris to collect on the roof. These items shall be <br />removed from the roof on a daily basis. <br />C. All tools and unused materials must be collected at the end of each workday and <br />stored properly off of the finished roof surface and protected from exposure to the <br />elements. <br />D. Dispose of or recycle all trash and excess material in a manner conforming to <br />current EPA regulations and local laws. <br />E. Properly clean the finished roof surface after completion, and make sure the <br />drains and gutters are not clogged. <br />F. Clean and restore all damaged surfaces to their original condition. <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.