My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: 20 <br />OWNER: INDIAN RIVER COUNTY <br />CONTRACTOR* <br />CONTRACT FOR: IRC JAIL COMPLEX ROOFING REPLACEMENT, RECOVER AND <br />REPAIR PROJECT , <br />Project No.: IRC -1736 <br />Project Description: THE PROJECT INVOLVES THE REPLACEMENT, RECOVER AND <br />REPAIR OF DESIGNATED ROOFING ASSEMBLIES AT THE INDIAN RIVER COUNTY. <br />JAIL COMPLEX TO PROVIDE A COMPLETE, WATERTIGHT, 20 -YEAR <br />WARRANTABLE ROOF SYSTEM. I <br />OWNER's Bid No. 2018021 <br />This Certificate of Substantial Completion applies, to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />And To <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not atter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within <br />00630 - Certificate of Substandal completion REV 04-07 <br />00630-1 <br />F.\Public wodm\EtiGDUMMG DIVISION PROJECM735 IRC Jan Compel Roof RepUmment Repay RojerAl Admin0dDommmtsWastC Conbad <br />Docvmm"0630 - Certificate of substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.