Laserfiche WebLink
1 <br />calendar days of the above date of Substantial Completion. <br />The responsibilities between OWNER and CONTRACTOR for security, operation, safety, <br />maintenance, heat, utilities, insurance and warranties and guarantees shall be as follows: <br />OWNER:- <br />WNER: <br />CONTRACTOR:- <br />CONTRACTOR:_ <br />The <br />The following. documents are attached to and made a part of this Certificate: <br />[For items to be attached see definition of Substantial Completion as supplemented and other specifically <br />noted conditions precedent to achieving Substantial Completion as required by Contract Documents.] <br />This certificate does not constitute an acceptance of Work not in accordance with the Contract <br />Documents nor is it a release of CONTRACTOR's obligation to complete the Work in <br />accordance with the Contract Documents. <br />Executed by ENGINEER on: (Date). <br />ENGINEER: <br />By: - <br />(Authorized Signature) <br />CONTRACTOR accepts this Certificate of Substantial Completion on (date). <br />CONTRACTOR: <br />By: <br />(Authorized Signature) <br />OWNER accepts this Certificate of Substantial Completion on (date). <br />OWNER: INDIAN RIVER COUNTY <br />By: - <br />(Authorized Signature) , <br />* * END OF SECTION <br />00630 - Certificate of Substantial completion REV 04-07 <br />00630-2 <br />F:1Publk WodgENGII4Mt DIVISION PROJEM1735 IRC Jail Compel Roof Replacement Repair Projadll-AdmiWBid DocummtsWaSta Contras <br />Documen1sM30 - Cafificate of Substa al Completion REV 04-07.doc <br />