My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/06/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/06/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:51:18 PM
Creation date
5/1/2018 1:58:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/06/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
526
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2018 -0085 -PAA -EQ <br />DOCKET NO. 20170226 -EQ <br />PAGE 43 <br />rtwncwAM)VYVK& MUM i.UMMINx amgtmrrsneerivo. iu.3ra <br />APPENUX D <br />TO THE STANDARD OFFER CONTRACT <br />DETAILED PROJECT iNFORNUTION <br />Each eligible Contract received by FPL will be evaluated to determine if Ute underlying QS project is financially and technically viable. The <br />QS shall, to the extent available, provide FPL with a detailed project proposal which addresses the information requested below. <br />1. FACILITY DESCRIPTION <br />• Project Name <br />• Project Location <br />a Street Address <br />♦ Site Plot Plan <br />♦ I-cgal l'Jescription of Sitc <br />• Generating Technology <br />• 'Facility Classification ( include types from stahnc) <br />• Primary Fuel <br />• Alternate Fuel (if applicable) <br />• Committed Capacity <br />• Expededln-Service Date <br />• Steatn Ilost (for cogeneration facilities) <br />• Street A(klmss <br />♦ Legal Description of Steam Host <br />♦ Iiost's annual steam requirements obs/yr) <br />• Contact Person <br />♦ Individual's Name and Tide <br />♦ Company Name <br />♦ Address <br />♦ Telephone Number <br />♦ TciccopyNmnbLr <br />11. PROJECT PARTICIPANTS <br />• Indicate the entities responsible for the follotsing project management activities and provide a detailed description of Ute <br />experience and capabilities of the entities: <br />• Project Development <br />♦ Siting and licensing the Facility <br />• Designing the Facility <br />• Constructing die Facility <br />♦ Scouring the Fuel Supply <br />♦ Operating the Facility <br />Provide details on all electrical generation facilities which are currently trader construction or operddonal which were <br />developed by the QS. <br />• Describe the financingstructure for The projects identified above, inchtdmg the type: of financing used, the permanent financing <br />term, The major lenders, and Tlr_ percentage of equity invested at financial closing. <br />(Continued on Shed No. 10.316) <br />Issued by: S. F Romig, Director, Rales and Tariffs <br />Effective: May 22, 2007 <br />9- <br />43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.