ORDER NO. PSC -2018 -0085 -PAA -EQ <br />DOCKET NO. 20170226 -EQ <br />PAGE 45 <br />PIAYKtVA nnvist .0 JAL.".[ cAltvrrAINY <br />(Continued from Sheet No. 10.316) <br />IV. PLANT DISPATCIIABILtfY!CONTROLLABILITY <br />.heel lrn. Iv.3r <br />• Provide the following operating characteristics and a detailed explanation supporting the performance capabilities indicated. <br />♦ Ramp Rate (MWItninute) <br />• Peak Capability (% above Committed Capacity) <br />♦ Minimum power level (% ofCcmurtittcd(alrncity) <br />♦ Facility Turnaround Time, Itot to Mot (iotas) <br />♦ Start-up Time from Cold Shutdown (hours) <br />a Unit Cycling (4 cycicVyr) <br />• Mw and M VAR Control (AGC, Manual, Other (please explain)) <br />V. SITING AND LI LASING <br />• Provide a licensing/pernutting milestone schedule which lists all perrnits, licences and variances required to site the Facility. <br />The milestone schedule shall also identify key milestone dates for baseline monitoring, application preparation, agency review, <br />certification and licensin&fing beard approval, and agency permit issuance. <br />• Provide a licensing/pennitting plan that addresses the issues of air emissions, water use, wastewater discharge, wetlands, <br />endangered species, protected properties, solid waste, surrounds» g land use, zoning for the Facility, associated linear facilities, <br />and support of and opposition to the Facility. <br />• IList the emissionlctTlucnt discharge limits the Facility will meet, and describe in detail the pollution control equipment to be <br />used to meet these limits. <br />VI. FACILITY DEVELOPTUENT AND PERFORMANCE <br />• Submit a detailed engineering, prochaenhent, construction, startup and commercial operation schedule. The schedule shall <br />include milestones for site acquisition, engineering phases, selection of the major equipment vendors: arcltitect engineer, GPC <br />contractor, and Facility operator, steam host integration, and delivery of major equipment. A discussion of the current status of <br />each milestone should also be included where applicable. <br />• Attach a diagram of the pourer block arrangement. Provide a list of the major equipment vendors and the name and model <br />number of the major equipment to be installed. <br />• Provide a detailed description of the proposed emironrhhental control technology for the Facility and describe the capabilities <br />of the proposed technology. <br />• Attach preliminary flow diagrams for the steam system, water system, and fuel system, and a main electrical one line diagram <br />for the Facility. <br />• State the expected heat rate (HH4) at 75 degrees Fahrenheit for loads of IM, 75%, and 50%. in addition, attach a <br />preliminary heat balance for the Facility. <br />• [NOTE: add any requirements related to demonstrating that the facility meets the requirements under the statute or applicable <br />rules) <br />(Continued on Sheet No. 10318) <br />issued by: S. E. Romig, Director, Rates rend Turiffs <br />Effective: May 22, 2007 <br />