My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/06/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/06/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:51:18 PM
Creation date
5/1/2018 1:58:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/06/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
526
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2018 -0085 -PAA -EQ <br />DOCKET NO. 20170226 -EQ <br />PAGE 7 <br />NkA Terdh Revised Sheet No. 9.030 <br />FIMIDA POWER & idGHT COMPANY Cancels FfththNinth Sheet Nm 9.030 <br />STANDARD OFFER CONTRACT FOR THE PURCHASE OF <br />CAPACITY AND ENERGY FROM A RENEWABLE ENERGY FACILITY OR A QUALIFYING <br />FACILITY WITH A DESIGN CAPACITY OF 100 KW OR LESS (3=2028 AVOIDED UNIT) <br />THIS STANDARD OFFER CONIRAC1' (the "Contract') is made and entered this day of <br />— by and between (herein after "Qualified Scller" <br />or "QS") a corporation/limited liability company organized and existing under the laws of the State of <br />and owner of a Renewable Energy Facility as defined in section 25-17.210 (1) F.A.C. or a <br />Qualifying Facility with a design capacity of 100 KW or less as defined in section 25-17.250, and Florida Power & <br />Light Company (hereinafter "FPI.") a corporation organized and existing under the laws of the State of Florida. <br />The QS and FPL shall be jointly identified herein as the `Parties". This Contract contains five Appendices; <br />Appendix A. QS -2 Standard Rate for Purchase of Capacity and Energy; Appendix B. Pay for Performance <br />provisions; Appendix C, Termination Fee; Appendix D. Detailed Project Information and Appendix E, contract <br />options to be selected by QS. <br />WITNESSETH: <br />WHEREAS, the QS desires to sell and deliver, and FPL desires to purchase and receive, firm capacity and <br />energy to be generated by the QS consistent with the terms of this Contract, Section 366.91, Florida Statutes, <br />and/or Florida Public Service Commission ("FPSC) Rules 25-17.082 through 25-17.091. F.A.C. and FPSC Rules <br />25-17.200 through 25.17.310.F.A.C. <br />WHEREAS. the QS has signed an interconnection agreement with FPL (the `Interconnection <br />Agreement",), or it has entered into valid and enforceable intcrconncction/transmission service agrcement(s) with <br />the utility (or those utilities) whose transmission facilities are necessary for delivering the firm capacity and energy <br />to FPL (the "Wheeling Agreement(s)'); <br />WHEREAS. the FPSC has approved the form of this Standard Offer Contract for the Purchase of Firm <br />Capacity and Energy from a Renewable Fnergy Facility or a Qualify=ing Facility with a design capacity of 100 KW <br />or less: and <br />WHEREAS, the Facility is capable of delivering firm capacity and energy to FPL for the term of this <br />Contract in a manner consistent with the provisions of this Contract; and <br />WHEREAS. Section 366.91(3), Florida Statutes, provides that the `prudent and reasonable costs <br />associated with a QS energy contract shall be recovered from the ratepayers of the contracting utility, without <br />differentiating among customer classes, through the appropriate cost -recovery clause mechanism" administered by <br />the FPSC. <br />NOW, THEREFORE, for mutual consideration the Parties agree as follows: <br />(Continued on Sheet No. 9.031) <br />Issued by: S. E. Romig, Director, Rates and Tariffs <br />Effective: duly -13,8}7 <br />W 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.