Laserfiche WebLink
ORDER NO. PSC -2018 -0085 -PAA -EQ <br />DOCKET NO. 20170226 -EQ <br />PAGE 8 <br />Second Revised Sheet No. 9.031 <br />FLORIDA POWER & LIGffr COAPANY Cancels First Sheet No. 9.031 <br />(Continued from Shcctl\lo. 9.030) <br />1. QS Facility <br />The QS contemplates, installing operating and maintaining a <br />KVA generating facility located <br />at (hereinafter called the "Facility'). The Facility is designed to <br />produce a maximum of kilowatts ("KW") of electric power at an 85% lagging to 85% leading power factor. The <br />Facility's location and generation capabilities are as described in the table below. <br />TECHNOI )GY AND GENERATOR CAPABILIT10% <br />Location: Specific legal description (e.g., metes and bounds or other legal <br />description with street address required) <br />City: <br />County: <br />Generator l'ype (Induction or Synchronous) <br />Type of Facility (Hydrogen produced from sources other than fossil fuels, biomass <br />as derined in Section 25-17.210 (2) F.A.C. , solar energy, geothermal energy, wind <br />energy, ocean energy, hydroelectric power, waste heat from sulfuric acid <br />manufacturing operations: or <100KAV cogenerator) <br />Technology <br />Fuel Type and Source <br />Generator Rating (k -VA) <br />Maximum Capability (K11j <br />Minimum Load <br />Pealdng Capability <br />Net Output (KW) <br />Power Factor (%) <br />Operating Voltage (kV) <br />Peak Internal Load K1V <br />The following sections (a) through (e) are applicable to Renewable Energy Facilities ("1117e) and section (e) is only <br />applicable to Qualifying Facilities with a design capacity of 100 KW or less: <br />(a) If the QS is a REF, the QS represents and warrants that (i) the sole source(s) of fuel or power used by the Facility <br />to produce energy for sale to FI'L during the term of this Contract shall be such sources as are defined in and <br />provided for pursuant to Sections 366.91(2) (a) and (b), Florida Statutes, and FPSC Rules 25-17.210(1) and (2), <br />F.A.C.; (ii) Fossil fuels shall be limited to the minimum quantities necessary for start-up, shut -down and for <br />operating stability at minimum load; and (iii) the REF is capable of generating the amount of capacity pursuant to <br />Section 5 of this Agreement without the use of fossil fuels. <br />(b) The Parties agree and acknowledge that if the QS is a REF, the QS will not charge for, and FPL shall have no <br />obligation to pay for, any electrical energy produced by the Facility from a source of fuel or power except ati <br />specifically provided for in paragraph 1(a) above. <br />(Continued on Sheet No. 9.032) <br />Effective: July 13, 2017 <br />