My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/20/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 1:04:05 PM
Creation date
5/1/2018 2:11:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/20/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
545
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Sanitary Sewer Sub -Element <br />due to speeifie eifeumstanees, <br />they seldem justify not eenneeting to the fegiefial system. In <br />the neighbefhoods <br />where individuals benefiting ffom the eapmeefien to the sanitafy sewef system <br />TREATMENT <br />In addition to septic tank -systems, public and private treatment plants provide wastewater <br />treatment within the county. In Indian River County, large regional public treatment plants now <br />predominate. Consequently, major treatment issues in the county relate primarily to ensuring <br />sufficient capacity (either on-site or off-site) to accommodate projected growth. <br />If wastewater demand were allowed to exceed the county's treatment capacity, untreated sewage <br />would have to be discharged. That would result in health hazards and environmental degradation <br />of surface water bodies. To prevent such an occurrence, the county must continue its policy of <br />approving new development only when sufficient capacity will be available. In this regard, the <br />county's computerized concurrency management system and its capital improvements plan <br />ensure that capacity will be available to serve new development concurrent with demand. <br />Public Treatment Plants <br />Besides producing high quality effluent, all public treatment plants currently have more than <br />enough capacity to accommodate existing demand. The following sections discuss the county's <br />future wastewater treatment needs and alternatives to meet those needs. <br />Projection of Future Demand <br />Assumptions <br />The comprehensive planning process is an opportunity for the county to complete an assessment <br />of its long range sanitary sewer needs. Such a needs assessment must consist of an analysis that <br />is more than a straight line linear projection. Future projections should utilize certain <br />assumptions based on past trends, present conditions, and future desires. The main assumptions <br />utilized in the sanitary sewer needs assessment are as follows: <br />• The county will be the primary provider of sanitary sewer collection, treatment, and <br />disposal; <br />• The City of Vero Beach will continue to serve the City of Vero Beach, the Town of <br />Indian River Shores and a portion of the unincorporated county; and <br />Community Development Department <br />Indian River County 35 <br />Ap� dix A <br />
The URL can be used to link to this page
Your browser does not support the video tag.