My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/20/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 1:04:05 PM
Creation date
5/1/2018 2:11:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/20/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
545
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan <br />Sanitary Sewer Sub -Element <br />90% to 95% of future new development will connect to the regional sewer system. <br />The county will continue to maintain these policies and evaluate the feasibility of regional <br />system versus package treatment plants for the above referenced type of developments. <br />The existing conditions section of this sub -element provides a discussion of the existing capacity <br />of centralized wastewater treatment facilities, with an emphasis on the county system. That <br />discussion addresses the supply side of the wastewater treatment system. This section considers <br />the demand side. <br />The information for this section is based on the permanent and functional population projections <br />contained in the Introductory Element and on the projected land use patterns contained in the <br />Future Land Use Element. That information is also consistent with the county utilities master <br />plan. To develop these projections, the county used data such as historic growth, population <br />estimates, number and type of dwelling units, and developed commercial/industrial acreage. <br />As with other facility analyses, planning for wastewater treatment facility expansion requires a <br />rational approach to projecting growth over a finite planning period. Past experience has shown <br />that using the historic growth of existing facilities in conjunction with population projections is <br />the most accurate method of projecting wastewater generation rates for future treatment facility <br />expansions. <br />Capital Improvements <br />According to the county sanitary sewer master plan, the total design capacity of the county <br />sanitary sewer system in 2030 is projected to be 19 million gallons per day (MGD), while total <br />demand is projected to be about 12.62 million gallons per day (MGD). To got to a 19 gallon pe <br />day eapaeity, either- the neAh eetinty fegietial plaRt eAiWef the West F-egiena4 plant will - -, <br />expanded in eaeh of the following years: 2010, 2015, and 2025. The iner-eases will be-. 2 nigd in <br />20'�i-fngd in 20153 and 3 mgd in 2025. This information is shown in the graph below. <br />Because all of the plants in the county system are interconnected, there is flexibility as to which <br />plant or plants will be expanded to accommodate future demand. <br />Community Development Department Indian River County 36 <br />Ap�Midix A <br />
The URL can be used to link to this page
Your browser does not support the video tag.