Attachment 1- Bid Form with OPCC Unit Costs <br />Item <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Total <br />BID ITEMS: <br />1. SEGMENT 3 CELL 2 EXPANSION <br />1A. Site Work <br />a. Site Preparation, Clearing, Grubbing <br />L.S. <br />1 <br />$42,287.00 <br />$42,300 <br />b. Site Grading <br />L.S. <br />1 <br />$11,756.00 <br />$11,800 <br />c. Imported Common Fill - Subgrade <br />C.Y. <br />44,000 <br />$21.60 <br />$950,400 <br />d. Interim Cell Stormwater Diversion Berm <br />L.F. <br />335 <br />$202.09 <br />$67,800 <br />e. 24 -inch by 36 -inch Elliptical RCP Culvert <br />LF. <br />200 <br />$146.96 <br />$29,400 <br />f. Fabric Formed Concrete Riprap <br />S.F. <br />150 <br />$14.87 <br />$2,300 <br />g. Coquina Shell Access Road and Shoulder <br />S.F. <br />4,050 <br />$1.77 <br />$7,200 <br />1B. Liner System <br />a. 6 -Inch Processed Sand Layer <br />C.Y. <br />11,500 <br />$34.12 <br />$392,400 <br />b. Geosynthetic Clay Liner <br />S.F. <br />449,000 <br />$1.30 <br />$583,700 <br />c. Secondary 60 -mil Textured HDPE Geomembrane <br />S.F. <br />449,000 <br />$1.12 <br />$502,900 <br />d. LDS Geonet <br />S.F. <br />449,000 <br />$1.13 <br />$507,400 <br />e. LDS Geocomposite Double Sided <br />S.F. <br />11,000 <br />$0.96 <br />$10,600 <br />f. Primary 60 -mil Textured HDPE Geomembrane <br />S.F. <br />449,000 <br />$1.12 <br />$502,9Do <br />g. LCS Geocomposite Double Sided <br />S.F. <br />449,000 <br />$1.63 <br />$731,900 <br />h. 24 -Inch Protective Sand Cover <br />C.Y. <br />49,000 <br />$33.22 <br />$1,627,800 <br />L Tie-in to Existing Cell (inclusive of all layers) <br />L.S. <br />1 <br />$17,000.00 <br />$17,000 <br />J. Metal Information Signs <br />Ea. <br />10 <br />$228.53 <br />$2,300 <br />k. Electrical Leak Location Survey <br />L.S. <br />1 <br />$35,000.00 <br />$35,000 <br />I. Cleaning and Video Inspection of the Leachate Collection and Leachate <br />Detection Systems <br />LS. <br />1 <br />$5,000.00 <br />$5,000 <br />m. Site Restoration Including Sod <br />L.S. <br />1 <br />$80,000.00 <br />$80,000 <br />n. Miscellaneous <br />LS. <br />1 <br />$0.00 <br />$o <br />1C. Leachate Detection System (LDS) Pump Station <br />a. LDS Pump Station Pump Package including all components for a complete <br />system (wetwell, hatch and safety grate, turbine meter with totalizer, 1.S -Inch <br />Schedule 80 PVC pipe and fittings, and control panel) <br />Ea. <br />1 <br />$109,240.00 <br />$109,300 <br />b. 18 -Feet x 13 -Feet x 10 -Inch Thick Concrete Slab <br />S.F. <br />234 <br />$12.84 <br />$3,100 <br />c. Miscellaneous <br />L.S. <br />1 <br />$0.00 <br />$0 <br />1D. Leachate Piping System <br />a. Leak Detection System including SDR 15.5 HDPE Pipe, Fittings, Geotextile wrap, <br />River Rock Bootless Pipe Penetration Cleanouu <br />L 5. <br />1 <br />$87,421.00 <br />$87,500 <br />b. Leachate Collection System including SDR 15.5 HDPE Pipe and Fittings, <br />Geotextile wrap, River Rock, Bootless Pipe Penetration, Cleanout, Plug Valves <br />L.S. <br />1 <br />$218,604.00 <br />$218,700 <br />c. S -Foot Diameter LCS Manhole <br />Ea. <br />2 <br />$5,095.81 <br />$10,200 <br />d. Horizontal Directional Drill 10 -Inch Solid SDR 15.5 HDPE Gravity Pipe <br />L.F. <br />100 <br />$173.69 <br />$17,400 <br />e. Miscellaneous <br />LS. <br />1 <br />$0 <br />IE. Electrical and Instrumentation and Control <br />a. Measurement and Control Instrumentation <br />a.l. Programming Points <br />Ea. <br />29 <br />$640.90 <br />$18,600 <br />a.2. Instruments <br />Ea. <br />16 <br />$3,318.49 <br />$53,100 <br />a.3. Tower and Antenna <br />Ea. <br />1 <br />$106,043.21 <br />$106,100 <br />b. Electrical Demolition Including Removal and Disposal <br />L.S. <br />1 <br />$2,169.00 <br />$2,200 <br />c. Grounding <br />L.F. <br />520 <br />$27.48 <br />$14,300 <br />d. Service & Distribution <br />$0 <br />d.1. Panelboard PP -1 <br />Ea. <br />1 <br />$11,777.00 <br />$11,800 <br />d.2. Main Circuit Breaker <br />Ea. <br />1 <br />$7,796.00 <br />$7,800 <br />d.3. ATS <br />Ea. <br />1 <br />$17,027.59 <br />$17,100 <br />d.4. TPA -COMP -A <br />Ea. <br />1 <br />$3,500.00 <br />$3,500 <br />d.5. TPA-LCS-A <br />Ea. <br />1 <br />$3,500.00 <br />$3,500 <br />d.6. Panelboard LP -LDS <br />Ea. <br />1 <br />$3,500.00 <br />$3,500 <br />d.7. Mounting Racks <br />Ea. <br />3 <br />$0 <br />d.8. 20KW Diesel Genset <br />Ea. <br />1 <br />$64,413.00 <br />$64,500 <br />e. Site Power <br />$0 <br />e.1. Power Handhole with Grounding 3 -Feet x 3 -Feet x 3 -Feet <br />Ea. <br />3 <br />$10,091.09 <br />$30,300 <br />e.2. Control Handhole with Rack 2=Feet x 2 -Feet x 2 -Feet <br />Ea. <br />2 <br />$10,091.09 <br />$20,200 <br />e.3. Concrete Encased Duct bank <br />L.S. <br />1 <br />$60,517.55 <br />$60,600 <br />e.4. Associated directional drilling, trenching, excavation, backfill, and <br />compaction as required for a complete underground system <br />L.S. <br />1 <br />$0 <br />I. Site Lighting pole <br />Ea. <br />3 <br />$5,772.00 <br />$17,400 <br />Smith, <br />02193_All 1.x1x <br />02019 [aM-fth inc 67 <br />Allfthu Ft -1 <br />1of3 <br />