Attachment 1- Bid Form with OPCC Unit Costs
<br />Item
<br />Unit
<br />Estimated
<br />Quantity
<br />Unit Price
<br />Total
<br />BID ITEMS:
<br />1. SEGMENT 3 CELL 2 EXPANSION
<br />1A. Site Work
<br />a. Site Preparation, Clearing, Grubbing
<br />L.S.
<br />1
<br />$42,287.00
<br />$42,300
<br />b. Site Grading
<br />L.S.
<br />1
<br />$11,756.00
<br />$11,800
<br />c. Imported Common Fill - Subgrade
<br />C.Y.
<br />44,000
<br />$21.60
<br />$950,400
<br />d. Interim Cell Stormwater Diversion Berm
<br />L.F.
<br />335
<br />$202.09
<br />$67,800
<br />e. 24 -inch by 36 -inch Elliptical RCP Culvert
<br />LF.
<br />200
<br />$146.96
<br />$29,400
<br />f. Fabric Formed Concrete Riprap
<br />S.F.
<br />150
<br />$14.87
<br />$2,300
<br />g. Coquina Shell Access Road and Shoulder
<br />S.F.
<br />4,050
<br />$1.77
<br />$7,200
<br />1B. Liner System
<br />a. 6 -Inch Processed Sand Layer
<br />C.Y.
<br />11,500
<br />$34.12
<br />$392,400
<br />b. Geosynthetic Clay Liner
<br />S.F.
<br />449,000
<br />$1.30
<br />$583,700
<br />c. Secondary 60 -mil Textured HDPE Geomembrane
<br />S.F.
<br />449,000
<br />$1.12
<br />$502,900
<br />d. LDS Geonet
<br />S.F.
<br />449,000
<br />$1.13
<br />$507,400
<br />e. LDS Geocomposite Double Sided
<br />S.F.
<br />11,000
<br />$0.96
<br />$10,600
<br />f. Primary 60 -mil Textured HDPE Geomembrane
<br />S.F.
<br />449,000
<br />$1.12
<br />$502,9Do
<br />g. LCS Geocomposite Double Sided
<br />S.F.
<br />449,000
<br />$1.63
<br />$731,900
<br />h. 24 -Inch Protective Sand Cover
<br />C.Y.
<br />49,000
<br />$33.22
<br />$1,627,800
<br />L Tie-in to Existing Cell (inclusive of all layers)
<br />L.S.
<br />1
<br />$17,000.00
<br />$17,000
<br />J. Metal Information Signs
<br />Ea.
<br />10
<br />$228.53
<br />$2,300
<br />k. Electrical Leak Location Survey
<br />L.S.
<br />1
<br />$35,000.00
<br />$35,000
<br />I. Cleaning and Video Inspection of the Leachate Collection and Leachate
<br />Detection Systems
<br />LS.
<br />1
<br />$5,000.00
<br />$5,000
<br />m. Site Restoration Including Sod
<br />L.S.
<br />1
<br />$80,000.00
<br />$80,000
<br />n. Miscellaneous
<br />LS.
<br />1
<br />$0.00
<br />$o
<br />1C. Leachate Detection System (LDS) Pump Station
<br />a. LDS Pump Station Pump Package including all components for a complete
<br />system (wetwell, hatch and safety grate, turbine meter with totalizer, 1.S -Inch
<br />Schedule 80 PVC pipe and fittings, and control panel)
<br />Ea.
<br />1
<br />$109,240.00
<br />$109,300
<br />b. 18 -Feet x 13 -Feet x 10 -Inch Thick Concrete Slab
<br />S.F.
<br />234
<br />$12.84
<br />$3,100
<br />c. Miscellaneous
<br />L.S.
<br />1
<br />$0.00
<br />$0
<br />1D. Leachate Piping System
<br />a. Leak Detection System including SDR 15.5 HDPE Pipe, Fittings, Geotextile wrap,
<br />River Rock Bootless Pipe Penetration Cleanouu
<br />L 5.
<br />1
<br />$87,421.00
<br />$87,500
<br />b. Leachate Collection System including SDR 15.5 HDPE Pipe and Fittings,
<br />Geotextile wrap, River Rock, Bootless Pipe Penetration, Cleanout, Plug Valves
<br />L.S.
<br />1
<br />$218,604.00
<br />$218,700
<br />c. S -Foot Diameter LCS Manhole
<br />Ea.
<br />2
<br />$5,095.81
<br />$10,200
<br />d. Horizontal Directional Drill 10 -Inch Solid SDR 15.5 HDPE Gravity Pipe
<br />L.F.
<br />100
<br />$173.69
<br />$17,400
<br />e. Miscellaneous
<br />LS.
<br />1
<br />$0
<br />IE. Electrical and Instrumentation and Control
<br />a. Measurement and Control Instrumentation
<br />a.l. Programming Points
<br />Ea.
<br />29
<br />$640.90
<br />$18,600
<br />a.2. Instruments
<br />Ea.
<br />16
<br />$3,318.49
<br />$53,100
<br />a.3. Tower and Antenna
<br />Ea.
<br />1
<br />$106,043.21
<br />$106,100
<br />b. Electrical Demolition Including Removal and Disposal
<br />L.S.
<br />1
<br />$2,169.00
<br />$2,200
<br />c. Grounding
<br />L.F.
<br />520
<br />$27.48
<br />$14,300
<br />d. Service & Distribution
<br />$0
<br />d.1. Panelboard PP -1
<br />Ea.
<br />1
<br />$11,777.00
<br />$11,800
<br />d.2. Main Circuit Breaker
<br />Ea.
<br />1
<br />$7,796.00
<br />$7,800
<br />d.3. ATS
<br />Ea.
<br />1
<br />$17,027.59
<br />$17,100
<br />d.4. TPA -COMP -A
<br />Ea.
<br />1
<br />$3,500.00
<br />$3,500
<br />d.5. TPA-LCS-A
<br />Ea.
<br />1
<br />$3,500.00
<br />$3,500
<br />d.6. Panelboard LP -LDS
<br />Ea.
<br />1
<br />$3,500.00
<br />$3,500
<br />d.7. Mounting Racks
<br />Ea.
<br />3
<br />$0
<br />d.8. 20KW Diesel Genset
<br />Ea.
<br />1
<br />$64,413.00
<br />$64,500
<br />e. Site Power
<br />$0
<br />e.1. Power Handhole with Grounding 3 -Feet x 3 -Feet x 3 -Feet
<br />Ea.
<br />3
<br />$10,091.09
<br />$30,300
<br />e.2. Control Handhole with Rack 2=Feet x 2 -Feet x 2 -Feet
<br />Ea.
<br />2
<br />$10,091.09
<br />$20,200
<br />e.3. Concrete Encased Duct bank
<br />L.S.
<br />1
<br />$60,517.55
<br />$60,600
<br />e.4. Associated directional drilling, trenching, excavation, backfill, and
<br />compaction as required for a complete underground system
<br />L.S.
<br />1
<br />$0
<br />I. Site Lighting pole
<br />Ea.
<br />3
<br />$5,772.00
<br />$17,400