Laserfiche WebLink
Attachment 1- Bid Form with OPCC Unit Costs <br />Item <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Total <br />g. Branch Circuits and Feeders- All Conduit and Wire Per Schedules on E-3 and E- <br />4 with all necessary fittings, pullboxes, supports, and appurtenances as required <br />for a complete and operable system Including material, Installation, termination, <br />and testing <br />LS. <br />1 <br />$158,752.00 <br />$158,800 <br />h. Short Circuit Coordination Study & Arc Flash Labels <br />L.S. <br />1 <br />I. FPL Fee <br />L.S. <br />i <br />- <br />- <br />J. Miscellaneous Items <br />L.S. <br />1 <br />$0.00 <br />$0 <br />1F. Survey <br />L.S. <br />1 <br />$15,000.00 <br />$15,000 <br />TOTAL BID ITEM 1 <br />$7,164,600 <br />2. SEGMENT 2 PARTIAL CLOSURE AND LANDFILL GAS SYSTEM EXPANSION <br />2A. Partial Closure Construction <br />a. Site Work <br />a.1. Site Clearing and Preparation <br />L.S. <br />1 <br />$49,553.00 <br />$49,600 <br />a.2. Site Grading <br />L.S. <br />1 <br />$22,853.00 <br />$22,900 <br />a.3. Common Fill <br />C.Y. <br />30,000 <br />$17.30 <br />$519,000 <br />b. Drainage & Containment <br />b.1 Remove existing 15 -Inch and 18 -Inch downcomers and replace w/ 24 -Inch <br />Corru ated HDPE Pipe <br />L.F. <br />2,500 <br />$76.36 <br />$190,900 <br />b.2. 24 -Inch RCP <br />L.F. <br />80 <br />$75.15 <br />$6,100 <br />b.3. 24 -inch Corrugated HDPE drainage pipe <br />L.F. <br />1,150 <br />$105.61 <br />$121,500 <br />b.4. 18 -inch Corrugated HDPE drainage pipe <br />L.F. <br />850 <br />$82.10 <br />$69,800 <br />b.5. 15 -Inch Corrugated HDPE drainage pipe <br />L.F. <br />520 <br />$50.30 <br />$26,200 <br />b.6. 8 -Inch Solid HDPE drainage pipe <br />L.F. <br />400 <br />$32.13 <br />$12,900 <br />b.7 8 -Inch Perforated HDPE pipe <br />LF. <br />400 <br />$62.86 <br />$25,200 <br />b.8.4 -inch Perforated HDPE Underdrain <br />L.F. <br />3,000 <br />$25.56 <br />$76,700 <br />b.9. Fabric Formed Concrete Riprap <br />S.F. <br />11,5001 <br />$12.21 <br />$140,500 <br />b.10. Flash Board Risers <br />Ea. <br />42 <br />$265.08 <br />$11,200 <br />c. New Asphalt Access Road <br />S.Y. <br />3,800 <br />$110.49 <br />$419,900 <br />d. Resurface Existing Asphalt Access Road <br />S.Y. <br />2,950 <br />$58.50 <br />$172,600 <br />e. LFG Collection Piping and Installation <br />e.1. 12 -Inch SDR 17 HDPE Solid Pipe and Fittings <br />LF. <br />1,600 <br />$83.19 <br />$133,200 <br />e.2. 10 -Inch SDR 17 HDPE Solid Pipe and Fittings <br />L.F. <br />1,350 <br />$67.84 <br />$91,600 <br />e.3.8 -Inch SDR 17 HDPE Solid Pipe and Fittings <br />LF. <br />800 <br />$62.86 <br />$50,300 <br />e.4. 6 -Inch SDR 17 HDPE Solid Pipe and Fittings <br />L.F. <br />4,000 <br />$41.89 <br />$167,600 <br />e.S 4 -inch SDR 17 HDPE Solid Pipe and Fittings <br />LF. <br />500 <br />$33.40 <br />$16,700 <br />e.6. Vertical Extraction Well <br />V.F. <br />2,900 <br />$409.80 <br />$1,188,500 <br />_ e.7. Horizontal Extraction Well <br />Ea. <br />4 <br />$1,916.29 <br />$7,700 <br />e.8. Well Head <br />Ea. <br />39 <br />$1,395.19 <br />$54,500 <br />e.9. Miscellaneous Valves & Fittings <br />L.S. <br />1 <br />$5,156.45 <br />$5,200 <br />e.10. Access Riser <br />Ea. <br />38 <br />$568.93 <br />$21,700 <br />e.11. Zone Valve <br />Ea. <br />18 <br />$4,412.13 <br />$79,500 <br />e.12. Summit Vent <br />Ea. <br />4 <br />$374.66 <br />$1,500 <br />f. Liner System <br />f.1. 6 -Inch Cap Foundation Layer <br />C.Y. <br />23,200 <br />$32.88 <br />$762,900 <br />f.2.40 -mil Linear Low -Density Polyethylene Geomembrane <br />S.F. <br />925,000 <br />$0.94 <br />$869,500 <br />0. Geocomposite Drainage Layer <br />S.F. <br />925,000 <br />$1.48 <br />$1,369,000 <br />f.4. Geocomposite Gas Venting Layer <br />S.F. <br />925,000 <br />$1.21 <br />$1,119,300 <br />f.5. 18 -Inch Protective Soil Layer <br />C.Y. <br />69,500 <br />$39.76 <br />$2,763,400 <br />f.6. 6 -inch Top Soil Cover <br />C.Y. <br />23,200 <br />$28.22 <br />$654,800 <br />f.7. Bahia Sod <br />S.F. <br />925,000 <br />$0.41 <br />$379,300 <br />f.8. Metal Information Signs <br />Ea. <br />4 <br />$200.26 <br />$900 <br />g. Compressed Air and Forcemain Piping, Fittings, Valves, and Ancillary <br />Components <br />g.1. 2 -inch DR 11 HDPE Compressed Air & Forcemain Pipe (same trench) <br />L.F. <br />15,200 <br />$17.61 <br />$267,700 <br />g.2. 2 -inch Compressed Air & Forcemain Valves <br />Ea. <br />26 <br />$412.09 <br />$10,800.00 <br />g.3 Well Dewatering Pump Assembly <br />Ea. <br />6 <br />$5,500.00 <br />$33,000.00 <br />h. Turn -Key Air Compressor System Including All Equipment and Electrical <br />Components and Connections and Prefabricated Metal Panel Enclosure (17 feet x <br />13 feet) with all appurtenances <br />L.S. <br />1 <br />$100,000.00 <br />$100,000.00 <br />I. Concrete Gravity Wall for Existing Pump Station <br />L.F. <br />70 <br />$142.86 <br />$10,000.00 <br />J. Site Restoration <br />L.S. <br />1 <br />$20,000.00 <br />$20,000.00 <br />k. Miscellaneous <br />L.S. <br />1 <br />- <br />2B. Survey <br />L.S. <br />1 <br />$40,000.00 <br />$40,000.00 <br />TOTAL BID REM 2 <br />$12,083,600.00 <br />CAIM <br />Sm th, <br />jp193 Mt 2.1. LQ <br />onla CAM smith l- V o <br />MI RIaMs Rae <br />2of3 <br />