Attachment 1- Bid Form with OPCC Unit Costs
<br />Item
<br />Unit
<br />Estimated
<br />Quantity
<br />Unit Price
<br />Total
<br />g. Branch Circuits and Feeders- All Conduit and Wire Per Schedules on E-3 and E-
<br />4 with all necessary fittings, pullboxes, supports, and appurtenances as required
<br />for a complete and operable system Including material, Installation, termination,
<br />and testing
<br />LS.
<br />1
<br />$158,752.00
<br />$158,800
<br />h. Short Circuit Coordination Study & Arc Flash Labels
<br />L.S.
<br />1
<br />I. FPL Fee
<br />L.S.
<br />i
<br />-
<br />-
<br />J. Miscellaneous Items
<br />L.S.
<br />1
<br />$0.00
<br />$0
<br />1F. Survey
<br />L.S.
<br />1
<br />$15,000.00
<br />$15,000
<br />TOTAL BID ITEM 1
<br />$7,164,600
<br />2. SEGMENT 2 PARTIAL CLOSURE AND LANDFILL GAS SYSTEM EXPANSION
<br />2A. Partial Closure Construction
<br />a. Site Work
<br />a.1. Site Clearing and Preparation
<br />L.S.
<br />1
<br />$49,553.00
<br />$49,600
<br />a.2. Site Grading
<br />L.S.
<br />1
<br />$22,853.00
<br />$22,900
<br />a.3. Common Fill
<br />C.Y.
<br />30,000
<br />$17.30
<br />$519,000
<br />b. Drainage & Containment
<br />b.1 Remove existing 15 -Inch and 18 -Inch downcomers and replace w/ 24 -Inch
<br />Corru ated HDPE Pipe
<br />L.F.
<br />2,500
<br />$76.36
<br />$190,900
<br />b.2. 24 -Inch RCP
<br />L.F.
<br />80
<br />$75.15
<br />$6,100
<br />b.3. 24 -inch Corrugated HDPE drainage pipe
<br />L.F.
<br />1,150
<br />$105.61
<br />$121,500
<br />b.4. 18 -inch Corrugated HDPE drainage pipe
<br />L.F.
<br />850
<br />$82.10
<br />$69,800
<br />b.5. 15 -Inch Corrugated HDPE drainage pipe
<br />L.F.
<br />520
<br />$50.30
<br />$26,200
<br />b.6. 8 -Inch Solid HDPE drainage pipe
<br />L.F.
<br />400
<br />$32.13
<br />$12,900
<br />b.7 8 -Inch Perforated HDPE pipe
<br />LF.
<br />400
<br />$62.86
<br />$25,200
<br />b.8.4 -inch Perforated HDPE Underdrain
<br />L.F.
<br />3,000
<br />$25.56
<br />$76,700
<br />b.9. Fabric Formed Concrete Riprap
<br />S.F.
<br />11,5001
<br />$12.21
<br />$140,500
<br />b.10. Flash Board Risers
<br />Ea.
<br />42
<br />$265.08
<br />$11,200
<br />c. New Asphalt Access Road
<br />S.Y.
<br />3,800
<br />$110.49
<br />$419,900
<br />d. Resurface Existing Asphalt Access Road
<br />S.Y.
<br />2,950
<br />$58.50
<br />$172,600
<br />e. LFG Collection Piping and Installation
<br />e.1. 12 -Inch SDR 17 HDPE Solid Pipe and Fittings
<br />LF.
<br />1,600
<br />$83.19
<br />$133,200
<br />e.2. 10 -Inch SDR 17 HDPE Solid Pipe and Fittings
<br />L.F.
<br />1,350
<br />$67.84
<br />$91,600
<br />e.3.8 -Inch SDR 17 HDPE Solid Pipe and Fittings
<br />LF.
<br />800
<br />$62.86
<br />$50,300
<br />e.4. 6 -Inch SDR 17 HDPE Solid Pipe and Fittings
<br />L.F.
<br />4,000
<br />$41.89
<br />$167,600
<br />e.S 4 -inch SDR 17 HDPE Solid Pipe and Fittings
<br />LF.
<br />500
<br />$33.40
<br />$16,700
<br />e.6. Vertical Extraction Well
<br />V.F.
<br />2,900
<br />$409.80
<br />$1,188,500
<br />_ e.7. Horizontal Extraction Well
<br />Ea.
<br />4
<br />$1,916.29
<br />$7,700
<br />e.8. Well Head
<br />Ea.
<br />39
<br />$1,395.19
<br />$54,500
<br />e.9. Miscellaneous Valves & Fittings
<br />L.S.
<br />1
<br />$5,156.45
<br />$5,200
<br />e.10. Access Riser
<br />Ea.
<br />38
<br />$568.93
<br />$21,700
<br />e.11. Zone Valve
<br />Ea.
<br />18
<br />$4,412.13
<br />$79,500
<br />e.12. Summit Vent
<br />Ea.
<br />4
<br />$374.66
<br />$1,500
<br />f. Liner System
<br />f.1. 6 -Inch Cap Foundation Layer
<br />C.Y.
<br />23,200
<br />$32.88
<br />$762,900
<br />f.2.40 -mil Linear Low -Density Polyethylene Geomembrane
<br />S.F.
<br />925,000
<br />$0.94
<br />$869,500
<br />0. Geocomposite Drainage Layer
<br />S.F.
<br />925,000
<br />$1.48
<br />$1,369,000
<br />f.4. Geocomposite Gas Venting Layer
<br />S.F.
<br />925,000
<br />$1.21
<br />$1,119,300
<br />f.5. 18 -Inch Protective Soil Layer
<br />C.Y.
<br />69,500
<br />$39.76
<br />$2,763,400
<br />f.6. 6 -inch Top Soil Cover
<br />C.Y.
<br />23,200
<br />$28.22
<br />$654,800
<br />f.7. Bahia Sod
<br />S.F.
<br />925,000
<br />$0.41
<br />$379,300
<br />f.8. Metal Information Signs
<br />Ea.
<br />4
<br />$200.26
<br />$900
<br />g. Compressed Air and Forcemain Piping, Fittings, Valves, and Ancillary
<br />Components
<br />g.1. 2 -inch DR 11 HDPE Compressed Air & Forcemain Pipe (same trench)
<br />L.F.
<br />15,200
<br />$17.61
<br />$267,700
<br />g.2. 2 -inch Compressed Air & Forcemain Valves
<br />Ea.
<br />26
<br />$412.09
<br />$10,800.00
<br />g.3 Well Dewatering Pump Assembly
<br />Ea.
<br />6
<br />$5,500.00
<br />$33,000.00
<br />h. Turn -Key Air Compressor System Including All Equipment and Electrical
<br />Components and Connections and Prefabricated Metal Panel Enclosure (17 feet x
<br />13 feet) with all appurtenances
<br />L.S.
<br />1
<br />$100,000.00
<br />$100,000.00
<br />I. Concrete Gravity Wall for Existing Pump Station
<br />L.F.
<br />70
<br />$142.86
<br />$10,000.00
<br />J. Site Restoration
<br />L.S.
<br />1
<br />$20,000.00
<br />$20,000.00
<br />k. Miscellaneous
<br />L.S.
<br />1
<br />-
<br />2B. Survey
<br />L.S.
<br />1
<br />$40,000.00
<br />$40,000.00
<br />TOTAL BID REM 2
<br />$12,083,600.00
<br />CAIM
<br />Sm th,
<br />jp193 Mt 2.1. LQ
<br />onla CAM smith l- V o
<br />MI RIaMs Rae
<br />2of3
<br />
|