Laserfiche WebLink
Attachment 1- Bid Form with OPCC Unit Costs <br />Item <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Total <br />3. PUBLIC CONSTRUCTION BOND AND INSURANCE (TOTAL) <br />L.S. <br />1 <br />4. MOBILIZATION AND DEMOBILIZATION (TOTAL) <br />L.S. <br />1 <br />S. WATER MAIN EXTENSION AND HYDRANT <br />SA. Water Main Extension and Hydrant <br />a. 8 -inch C900 PVC Water Main <br />L.F. <br />1,750 <br />$71.78 <br />$125,700 <br />b. Directional Drill 8 -inch 0900 PVC Water Main ` <br />LF. <br />100 <br />$173.69 <br />$17,400 <br />c.8 -Inch Tapping Saddle&Gate Valve <br />Ea. <br />1 <br />$2,192.63 <br />$2,200 <br />d. Hydrant and Ancillary Components <br />Ea. <br />1 <br />$4,954.05 <br />$51000 <br />e. 2 -Inch Sch 80 Pipe, Hose Bibb, Meter and Backflow preventerto LCS Pump <br />Station <br />Ea. <br />1 <br />$2,538.95 <br />$2,600 <br />f. Flushing, Disinfection, and Testing <br />L.S. <br />1 <br />g. Miscellaneous <br />L.S. <br />1 <br />- <br />5B. Survey <br />L.S. <br />1 <br />$3,000.00 <br />$3,000 <br />TOTAL BID REM 5 <br />$155,900 <br />6. LEACHATE COLLECTION SYSTEM (LCS) PUMP STATION AND FORCEMAINS <br />6A. Leachate Collection System Pump Station <br />a. Duplex LCS Pump Station Pump Package including all components for a <br />complete system (precast wetwell, hatch and safety grate, turbine meter with <br />totalizer, control panel, valves, ARV, pressure gauge, HDPE pipe and fittings, <br />ductile iron pipe and fittings, pipe supports, miscellaneous appurtenances, and <br />dewatering) <br />L.S. <br />1 <br />$218,449.48 <br />$218,500 <br />b. 10 -inch Concrete Slab and Driveway <br />S.F. <br />1,400 <br />$11.54 <br />$16,200 <br />c. S -Foot Diameter Pump Out Manhole <br />Ea. <br />1 <br />$6,289.98 <br />$6,300 <br />6B. Leachate Forcemains <br />a. 2 -Inch Dual Contained (in 4 -Inch) HDPE Forcemain <br />L.F. <br />292 <br />$40.14 <br />$11,800 <br />b. 2 -Inch Plug Valve <br />Ea. <br />2 <br />$915.52 <br />$1,900 <br />c.4 -Inch Solid SDR 11 HDPE Forcemain <br />L.F. <br />1,700 <br />$33.40 <br />$56,800 <br />d. Directional Drill 4 -Inch Solid DR 11 HDPE Forcemaln <br />L.F. <br />100 <br />$115.14 <br />$11,600 <br />e. 4 -Inch Plug Valve <br />Ea. <br />2 <br />$1,124.53 <br />$2,300 <br />6C. Survey <br />L.S. <br />1 <br />$3,000.00 <br />$3,000 <br />TOTAL BID ITEM 6 <br />$328,400 <br />7. CONTINGENCY ALLOWANCE (10%) <br />LS. <br />1 <br />$1,973,250.00 <br />GRAND TOTAL BID (Items 1.6) <br />$19,732,500.00 <br />GRAND TOTAL BID (Items 1-6 and 7) <br />$21,705,750.00 <br />Smith. <br />Q1193 attlxhv 69 <br />01018 COM Smith Mc <br />NI RIyMs ResmeE <br />3of3 <br />