Attachment 1- Bid Form with OPCC Unit Costs
<br />Item
<br />Unit
<br />Estimated
<br />Quantity
<br />Unit Price
<br />Total
<br />3. PUBLIC CONSTRUCTION BOND AND INSURANCE (TOTAL)
<br />L.S.
<br />1
<br />4. MOBILIZATION AND DEMOBILIZATION (TOTAL)
<br />L.S.
<br />1
<br />S. WATER MAIN EXTENSION AND HYDRANT
<br />SA. Water Main Extension and Hydrant
<br />a. 8 -inch C900 PVC Water Main
<br />L.F.
<br />1,750
<br />$71.78
<br />$125,700
<br />b. Directional Drill 8 -inch 0900 PVC Water Main `
<br />LF.
<br />100
<br />$173.69
<br />$17,400
<br />c.8 -Inch Tapping Saddle&Gate Valve
<br />Ea.
<br />1
<br />$2,192.63
<br />$2,200
<br />d. Hydrant and Ancillary Components
<br />Ea.
<br />1
<br />$4,954.05
<br />$51000
<br />e. 2 -Inch Sch 80 Pipe, Hose Bibb, Meter and Backflow preventerto LCS Pump
<br />Station
<br />Ea.
<br />1
<br />$2,538.95
<br />$2,600
<br />f. Flushing, Disinfection, and Testing
<br />L.S.
<br />1
<br />g. Miscellaneous
<br />L.S.
<br />1
<br />-
<br />5B. Survey
<br />L.S.
<br />1
<br />$3,000.00
<br />$3,000
<br />TOTAL BID REM 5
<br />$155,900
<br />6. LEACHATE COLLECTION SYSTEM (LCS) PUMP STATION AND FORCEMAINS
<br />6A. Leachate Collection System Pump Station
<br />a. Duplex LCS Pump Station Pump Package including all components for a
<br />complete system (precast wetwell, hatch and safety grate, turbine meter with
<br />totalizer, control panel, valves, ARV, pressure gauge, HDPE pipe and fittings,
<br />ductile iron pipe and fittings, pipe supports, miscellaneous appurtenances, and
<br />dewatering)
<br />L.S.
<br />1
<br />$218,449.48
<br />$218,500
<br />b. 10 -inch Concrete Slab and Driveway
<br />S.F.
<br />1,400
<br />$11.54
<br />$16,200
<br />c. S -Foot Diameter Pump Out Manhole
<br />Ea.
<br />1
<br />$6,289.98
<br />$6,300
<br />6B. Leachate Forcemains
<br />a. 2 -Inch Dual Contained (in 4 -Inch) HDPE Forcemain
<br />L.F.
<br />292
<br />$40.14
<br />$11,800
<br />b. 2 -Inch Plug Valve
<br />Ea.
<br />2
<br />$915.52
<br />$1,900
<br />c.4 -Inch Solid SDR 11 HDPE Forcemain
<br />L.F.
<br />1,700
<br />$33.40
<br />$56,800
<br />d. Directional Drill 4 -Inch Solid DR 11 HDPE Forcemaln
<br />L.F.
<br />100
<br />$115.14
<br />$11,600
<br />e. 4 -Inch Plug Valve
<br />Ea.
<br />2
<br />$1,124.53
<br />$2,300
<br />6C. Survey
<br />L.S.
<br />1
<br />$3,000.00
<br />$3,000
<br />TOTAL BID ITEM 6
<br />$328,400
<br />7. CONTINGENCY ALLOWANCE (10%)
<br />LS.
<br />1
<br />$1,973,250.00
<br />GRAND TOTAL BID (Items 1.6)
<br />$19,732,500.00
<br />GRAND TOTAL BID (Items 1-6 and 7)
<br />$21,705,750.00
<br />Smith.
<br />Q1193 attlxhv 69
<br />01018 COM Smith Mc
<br />NI RIyMs ResmeE
<br />3of3
<br />
|