APT I M April 11, 2018 <br />® Page 8 of 10 <br />in as expeditious a manner as possible. <br />Task 6: Cost <br />The lump sum cost for this task is $15,924.00. <br />Task 7: Include Offshore Borrow Area as Sand Source (Optional) <br />The Sector 5 Beach and Dune Restoration Project is currently being designed and permitted with fill. sources from <br />upland sand mines. The proposed Sector 3 and Sector 7 renourishment projects will likely include offshore sand <br />as a potential sand source. Considering the.similar project development schedule, it may be conceivable to utilize <br />the same offshore borrow area for multiple concurrent projects. This could increase the potential that an offshore <br />borrow source be more cost effective than upland sources for the Sector 5 project. As such, APTIM will perform <br />the following task to include an offshore borrow area as a sand source for the Sector 5 project utilizing existing <br />and available data and information. This work assumes that the proposed offshore borrow area has been <br />sufficiently investigated and developed (per permitting agency requirements) for the planned Sector 3 and/or <br />Sector 7 project, or for a regional County -wide sand search investigation. This task does not include any field work <br />or geotechnical laboratory analyses. <br />Task 7: Scope of Work <br />If the County decides to move forward with offshore sand as a potential source for the Sector 5 Project, APTIM <br />will determine if sufficient sand volume is available within the offshore borrow area to construct the Sector 5 <br />project. If sufficient volumes exist, the following work is anticipated for inclusion of the offshore borrow area for <br />the project.. <br />• The offshore borrow area will be designed utilizing previously collected geophysical and hydrographic <br />data. This will include developing composite sediment characteristics and a composite grain size <br />distribution for the proposed offshore borrow area. The composites will be used to analyze the <br />compatibility of the proposed offshore borrow area with the native sediment of Sector 5. Beach sand <br />samples collected in 2015 will be utilized to describe the native sediment of Sector 5. <br />• Coordination with the permit and regulatory agencies will be initiated to identify the data and information <br />submittals required for modification of the existing permit to include the offshore borrow area. The <br />requisite data and information will be assembled and submitted. This will include establishing the need <br />to permit the travel/pipeline corridors from the borrow area to the pumpout site on the beach and <br />designing the corridors to minimize the potential for impacts to offshore resources and infrastructure (i.e. <br />AT&T cables). Due to the close proximity of the nearshore hardbottom in the project area, it may be <br />challenging to utilize the hydraulic fill method to accomplish relatively thin fill densities. Special <br />considerations to project logistics may need to be considered to utilize this method, including stockpiling <br />material and/or pre -excavating and diking fill areas prior to placement. We will coordinate with the <br />agencies to help develop reasonable and acceptable project parameters. A letter will be drafted <br />requesting a permit modification, which will include figures and tables describing the proposed offshore <br />IRC Sector 5 — 2018029 — W0#1: Pre -Construction Services Proj. #631236907 <br />