My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-080
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 1:55:26 PM
Creation date
5/3/2018 2:53:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/01/2018
Control Number
2018-080
Agenda Item Number
8.Q.
Entity Name
REI Engineers
Subject
Roof Replacement at Indian River County (IRC) North County RO Water Plant
Area
7751 58th Avenue, Vero Beach
Project Number
1802
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REI Proposal No. P17TPA-039 Revision 3 <br />January 16, 2018 <br />Page 3 <br />I. Conduct a 2 -year Contractor Warranty Inspection before the warranty expires to address <br />warranty issues with the Contractor and Manufacturer. <br />III. PROPOSED SCOPE OF WORK <br />A. Low Slope Roof Sectors A, B, C, D & E: Remove existing roof system down to the existing <br />structural deck and provide new PVC roof system along with sheet metal flashing and <br />accessories to provide a complete, watertight, 20 -year warrantable roof assembly. Roof <br />system selected will be submitted to Owner for approval. <br />B. Reference drawing "RI" dated January 16, 2018 for designation of roof sectors. <br />IV. OPINION OF PROBABLE CONSTRUCTION COSVENGINEERING FEES <br />A. Based on the anticipated scope of work for this project, the proposed engineering fees are: <br />Engineering Fees: <br />Contract Review Draft Documents............................................................... $6,800 <br />Contract Final Draft Documents................................................................... $5,800 <br />BiddingPhase.................................................................................................. $900 <br />Construction Administration......................................................................... $9,550 <br />Total............................................................................................................ $23,050 <br />V. PROJECT SCHEDULE <br />A. Preliminary Contract Documents shall be completed within thirty (30) days of Notice to <br />Proceed. Final Contract Documents shall be completed and sealed within ten (10) days of <br />receipt of comments. <br />B. Construction Administration shall be performed during the estimated construction duration <br />and the project closeout process. This work is expected to take forty-five (45) days <br />calendar days. <br />If this proposal meets with your approval, please notify us in writing. This proposal will remain firm for a <br />period of thirty (30) days. After that time, we reserve the right to review scheduled commitments and <br />prices. <br />If you have any questions regarding this matter, please do not hesitate to call. <br />Respectfully submitted, <br />REI Engineers <br />Mark Renninger, PE, RRC, RRO <br />Branch Manager <br />th <br />let <br />ENGIhCERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.