My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-087
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 2:01:04 PM
Creation date
5/9/2018 2:25:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/08/2018
Control Number
2018-087
Agenda Item Number
8.G.
Entity Name
Kimley Horn and Associates
Subject
Mast Arms
Area
Grand Harbor and Indian River Boulevards
Project Number
1806
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 1 <br />Indian River Blvd & Grand <br />Harbor Blvd - Mast Arm <br />The following additional data shall be utilized for development of the plans: <br />1. The roadway plans sheets will be drawn at a scale of 1" = 40' prepared on 11" x <br />17" sheets. <br />2. Plan sheets shall depict existing right-of-way, section lines, property lines, <br />temporary construction easements, and centerline of construction. Horizontal <br />control points with state plane coordinates for all PC's, PT's, curve radius, curve <br />length and horizontal PI's shall be included on the Plan or summarized in an <br />alignment table. <br />3. Signing and Pavement Markings will be included within the Construction <br />Documents. All signing and pavement markings are to be prepared in accordance <br />with the latest design standards and practices (MUTCD), FDOT Standard <br />Specifications, Indexes, and COUNTY standards. <br />4. Plans shall include spot grades adequate to describe any proposed grading. <br />5. Match lines shall not be located within the limits of an intersection. <br />6. If applicable, soil boring information shall be plotted on cross sections with soil <br />classification and high season water table. <br />7. All quantities shall reference FDOT Pay Item Numbers. <br />8. All details shall reference FDOT Index Numbers, where applicable. <br />9. All specifications shall reference the FDOT Specifications for Road and Bridge <br />Construction. Any deviations or special specifications not included in FDOT <br />Specifications will be provided in the Technical Specifications. <br />10.Initial (40% completion), interim (80% completion) and Final Plan (100% <br />completion) Submittal shall include the following: <br />i. Three (3) Sets Plans. <br />ii. One (1) Opinion of Probable Construction Cost <br />iii. One (1) CD with drawings in PDF format. <br />The Consultant will be responsible for producing an opinion of probable cost (OPC) <br />estimate and reviewing and updating the OPC when scope changes occur and/or at <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.