My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-087
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 2:01:04 PM
Creation date
5/9/2018 2:25:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/08/2018
Control Number
2018-087
Agenda Item Number
8.G.
Entity Name
Kimley Horn and Associates
Subject
Mast Arms
Area
Grand Harbor and Indian River Boulevards
Project Number
1806
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 1 <br />Indian River Blvd & Grand <br />Harbor Blvd - Mast Arm <br />designated milestones of the project. A Summary of Pay Items sheet shall be prepared <br />with all required Initial (40%), Interim (80%) and Final Plan (100%) submittals. The Final <br />Plans will be provided signed and sealed. The plans will be prepared based upon English <br />units. The design will be conducted in MicroStation and Geopak. The Final Plans will be <br />provided in Autodesk Civil 3D format. <br />C. Signing and Pavement Marking Plans: <br />Signing and Pavement Marking plans shall include: Preparation of the plan layout, key <br />map, quantities (including signing and pavement marking quantity), tabulation of <br />quantities, and detail of major signs. Plans are to be prepared in accordance with the latest <br />design standards and practices (MUTCD), FDOT Standard Specifications, Indexes, and shall <br />be accurate, legible, complete in design and drawn at the same scale as the Roadway Plans, <br />furnished in reproducible form. <br />D. Franchise Utility Coordination: <br />The Consultant will coordinate with franchise utility operators in the vicinity of the project <br />such that the proposed construction activities can be developed to minimize impacts to <br />existing utilities located within the project limits. Franchise utility adjustments, designed <br />by the respective franchise utility, will be requested by the Consultant and reflected within <br />the prepared construction documents. <br />The Consultant will coordinate with the electrical service provider relative to the location <br />and infrastructure required to accommodate the proposed power supply location. <br />Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.