My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-093
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 2:10:56 PM
Creation date
5/18/2018 3:47:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/15/2018
Control Number
2018-093
Agenda Item Number
8.H.
Entity Name
Schulke, Bittle & Stoddard, LLC
Subject
Rehabilitate/Re-construct the Blower Building at the West Regional Wastewater Treatment Plant
Area
West Regional Wastewater Treat ment Plant, 8405 8th Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT `B' <br />FEESCHEDULE <br />WORK ORDER NO. 1 <br />Method and Amount of Compensation <br />Schulke, Bittle & Stoddard, L.L.C., proposes to provide the above Scope of Services based on the following lump sum <br />fees: <br />1. Preliminary plan review and evaluation: <br />$10,500.00 <br />A. Review the existing plans of record. On-site evaluation <br />of the existing blowers, building and system components, including: <br />- On-site review — photograph and document existing conditions, where possible <br />- Coordinate field review(s) with consultant(s) <br />B. Prepare preliminary structural, electrical, and mechanical drawings and prepare take -off / <br />construction estimate based on field review, consultant's input, and consider rehabilitation <br />options and make recommendation on reconstruction and repairs for three (3) options: <br />a. Replace the metal building with a new building on the same foundation <br />b. Construct a new concrete block building at a new (presumable adjacent) location <br />c. Specify a pre -fab "cabinet" that will house the blowers only (cabinets and blower <br />skid designed by others) <br />2. Final Design <br />$5,500.00 <br />Engineering design: preparation of Construction Plans, detailed specifications, <br />and construction details for one (1) of the above listed three (3) options. <br />3. Contractor procurement / bid documents <br />$3,000.00 <br />Preparation of bid documents using IRC standard forms. Assistance during <br />Bidding, including preparation of an approved contractors bid list, coordinating <br />and chairing a pre-bid meeting, process answers to RFI's, bid evaluation, prepare <br />addendum (if necessary) and prepare recommendation of contract award. <br />4. Contract Administration and Construction Phase services <br />$9,000.00 <br />Coordinate and chair a pre -construction meeting, shop drawing sample review, <br />review progress payments, prepare minor plan modifications, Construction/Field <br />Inspections, as -built review, coordinate post construction conference and inspect <br />structure for warranty approval, and review final documentation for close-out and <br />prepare notice of substantial completion, final recommendation for payment upon <br />satisfactory job completion. Inspections portion of this fee based on: <br />Assume 3 hours / day @ 20 days <br />5. Reimbursable Expenses: (estimated) <br />$1,000.00 <br />Payment of direct costs, including Reproduction costs (prints and copies), <br />application fees, mail and delivery, mileage during construction phase services. <br />(See below for actual costs) <br />Total: <br />$29,000.00 <br />Grand Total <br />$29,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.