My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/04/2011 (4)
CBCC
>
Meetings
>
2010's
>
2011
>
01/04/2011 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2018 4:57:14 PM
Creation date
5/18/2018 4:54:36 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/04/2011
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Millstone. Landing Phase 111 September -2.2009 <br />Sidewalk Performance Bondi Exhibit <br />Construction cost and bond amount for sidewalk not Constructed. . <br />item Description Quantity Unit -Unit Price Total <br />Percein t Total To <br />Remaml ig Complete - <br />1 5' Sidewalk (4" #hick - Form and Pour): 8,805 SF $ 3,27 $ 28,792:35. 100% $ 28,792.36 <br />2 Sodding 1,161 LF $ 0.50 $ 880.50 100% $ 880.50 <br />3 Clearing & Grading 1,781 LF $ 2.25 $ 3,862.25 100% . $ 3.M.25 <br />4. Mobilization 1 LS $ 1,500M $ 1,500.00 10V10 $ 1,500.00 <br />5 Erosion Control 1 LS $ 1,€]00:00 9,000.00 10D°l $ 1,0073.710 <br />TOTAL CONSTRUCTION C@ST:. $ 36;736,10. $ 36,13&10 <br />Performance bond @126% of Balance: $ 45,168.88 <br />r <br />PREPARED BY MA LLER i <br />John- Boyer; A& FL.#M7t! <br />31,rlior Project Engineer <br />I•t l;t. <br />EXHIBIT <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.