Laserfiche WebLink
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Joseph A. Baird, County Administrator <br />THROUGH: Christopher R. Mora, P.E., Public Works Director <br />AND <br />Christopher J. Kafer, Jr., P.E., County Engine <br />FROM: Thomas J. Croonquist, P.S.M., County Surveyor '-,(> �- <br />SUBJECT: Final Approval for Recording CR 592, Phase 4, From Interstate 95 to <br />West of CR 510 <br />DATE: December 16, 2010 CONSENT AGENDA <br />DESCRIPTION AND CONDITIONS <br />The Public Works Department is actively updating surveys and maps of various County Right -of - <br />Ways. These maps may be directly related to current or future Capital Improvement projects, or <br />used to define poorly documented and/or problematic corridors. <br />These surveys are performed under the direction of the County Engineer and County Surveyor. The <br />projects include field surveys as well as researching and confirming all available documents, deeds <br />and maps of record and other information available within the County repository. The Right -of -Way <br />reap for CR 512, Phase 4, from Interstate 95 to West of CR 510, is hereby presented for the Board <br />of County Commissioners' approval. The Right -of -Way map has been reviewed and approved by <br />the County Surveyor and County Attorney. <br />Once the Board of County Commissioners approves the Right -of -Way map, the map will be <br />recorded in the Public Records of Indian River County, formally recognizing the limits of the County <br />Right -of -Way. Public recording makes the information readily accessible to the public and further <br />enhances Title Search capabilities, as well as research, design, planning and surveying applications <br />along the corridor. <br />Additionally, the surveywill be incorporated into the County Property Appraisers GIS Parcel Mapping <br />database, which has proven to be a benefit in advancing the accuracy of the GIS parcel and related <br />mapping products. <br />Utilizing Secondary Roads Gas Tax funds, the survey was completed by Masteller, Moler, Reed & <br />Taylor, Inc. at a cost of $32,700.04. <br />The cost for filing and recording the map will be approximately $255.00. <br />Attached please find a minimized version of the Right -of -Way map completed by Masteller, Moler, <br />Reed & Taylor, Inc. If the need arises for the Board of County Commissioners to further review the <br />map, an electronic version will be supplied prior to the scheduled Consent Agenda. <br />f:\pub1icworks\engineerine division projects\9611b cr512 phase 4 row mapping (mmr&t)\surveyjwork ordersjangenda\l4-12-16 hoc agenda <br />req app. row map approval cr512, phase 4.doc <br />22 <br />