Laserfiche WebLink
0 Exhibit B <br />IRCUD approval to tap line for client in.2014 <br />Due to force main being covered by asphalt and MOT required <br />Sent 7/14/14 <br />Job address: 1155 27th Ave SW <br />Wayne, <br />As discussed IRCDUS will tap the forcemain located on the west side of 27th Ave SW and run a 4" <br />line to the west end of the road right-of-way line (your property line) with a gate valve. Please <br />note that the exact location to be determined at a later date. If lane closure, pavement <br />restoration is required as part of the tap, IRCDUS will be responsible that work. You will be <br />responsible for the $500.00 tap. Please see attached revised connection cost estimate. <br />Thank you, <br />Arjuna Weragoda, P.E. <br />Capital Projects Manager <br />IRC Department of Utility Services <br />180127th Street <br />Building A <br />Vero Beach, FL 32960 <br />Direct:772-226-1821 <br />aweragoda@ircgov.com <br />• <br />245- 5 <br />