My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/08/2018
CBCC
>
Meetings
>
2010's
>
2018
>
05/08/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:39:24 PM
Creation date
6/12/2018 2:40:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/08/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />INDIAN RIVER COUNTY PARKS DIVISION <br />PROPOSED CIVIL ENGINEERING AND SURVEYING SCOPE / BUDGET <br />JONES' PIER CONSERVATION AREA WETLAND RESTORATION PROJECT <br />May 2018 <br />This proposal is based on the narrative and preliminary drawings within the Jones' Pier IRLNEP <br />Grant "Draft Statement of Work" that the County provided on April 20, 2018 <br />TASK 1 PRELIMINARY PLANNING <br />Attend coordination meetings with INDIAN RIVER COUNTY Parks Division staff and <br />consultants to develop stormwater management and wetland restoration plan. Attend site visit to <br />observe existing conditions of site and drainage flow patterns. Provide recommendation(s) for <br />addressing off-site runoff from development south of the property. Verify areas needed for <br />additional topographic information provided in task 2 below. Prepare conceptual site plan of <br />stormwater management and wetland restoration master plan. Attend pre -application meeting <br />with permitting agencies. Provide preliminary volume quantities from proposed pond areas to <br />verify sufficient fill is available, as determined by others, for proposed site developments. <br />Fees for Task 1 services are estimated @ $3,900.00. <br />TASK 2 - SITE SURVEYS <br />Perform Topographic Survey on-site and immediately off-site for additional information needed <br />along the southern property line between Jungle Trail and hammock area. Locate contributory <br />runoff areas ftom properties alongside Morningside Drive. Field verify conditions along north <br />property line and spot check grades on-site. <br />Fees for Task 2 services are estimated @........................................ $3,100.00. <br />TASK 3—STORMWATER CALCULATIONS <br />Prepare stormwater management report for site to include flood routings, pond sizing, discharge <br />calculations, and drawdown analysis. Design and model pump station to mimic high tide/low <br />tide cycles or a continuous cycle. Investigate collection and treatment of off-site stormwater <br />runoff from portions of adjacent Morningside Drive neighborhood into proposed storrnwater <br />management plan or alternative bypass. <br />Fees for Task 3 services are estimated @....................................................................... $7,900.00. <br />KUHMPROPOSAWones Pier Wetland Restoration.doc Page 2 of 5 _ At Serving Florida <br />©2018 by CAI �fxSince IJ106b <br />
The URL can be used to link to this page
Your browser does not support the video tag.