Laserfiche WebLink
TASK 4 — CONSTRUCTION PLANS AND SPECIFICATIONS <br />Develop drainage and grading plans for stormwater collection system and wetland restoration <br />areas. Provide details for wetland/upland preservation and creation. Coordinate with County <br />Staff for wetland planting plan. Develop detail sheets, cross-sections, and prepare project <br />specifications sufficient for bidding. Provide pump station performance criteria for <br />manufacturing design and construction. Prepare preliminary engineer's cost estimate for <br />construction. <br />Feesfor Task 4 services are estimated @....................................................................... $5,800.00. <br />TASK 5 - PERMITTING <br />Prepare application documents to obtain the following permits: <br />• St. Johns River Water Management District Environmental Resource Permit. <br />• Army Corp of Engineers <br />• Indian River County Wetlands Permit <br />Feesfor Task 5 services are estimated @....................................................................... $6,400.00. <br />TASK 6 - BID DOCUMENTS <br />It is assumed INDIAN RIVER COUNTY will prepare a contract for construction, including <br />bidding requirements and general conditions. ENGINEER will provide technical specifications <br />and project plans in sufficient detail to define the scope and requirements for the stormwater <br />management and wetland restoration plan. ENGINEER will assist INDIAN RIVER COUNTY <br />in bidding the project by attending a pre-bid meeting and by addressing inquiries from potential <br />bidders regarding the scope of the proposed work. ENGINEER will assist the County during <br />project bid review and provide a letter summarizing our recommendations regarding contract <br />award. <br />Feesfor Task 6 services are estimated @..............................................................„_,,........ $2,400.00. <br />TASK 7 - CONSTRUCTION SERVICES <br />Review contractor's material submittals and scheduling. Construction inspection services will be <br />provided for the duration of construction in order to ensure that the contractor's work conforms <br />to the requirements of the project design drawings and specifications. Provide certifications <br />upon completion of construction and review of contractor provided as-builts. <br />Fees for Task 7 services are estimated @........................................................................... $6,800.00. <br />NAJHBIPROPOSALQones Pier Wetland Restoration.doc Page 3 of 5 r02U <br />SeMpg Florida <br />02018 by CAI <br />Since 191 4 1 <br />