My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/08/2018
CBCC
>
Meetings
>
2010's
>
2018
>
05/08/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:39:24 PM
Creation date
6/12/2018 2:40:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/08/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 8 — REIMBURSABLE EXPENSES <br />Reimbursable expenses, such as postage, long distance calls, mileage, fax transmittals, prints, <br />copies, vellum, etc. <br />Fees for Task 8 services are estimated @ ................................................ $500.00. <br />TOTAL ENGINEERING BUDGET <br />FOR TASKS 1 THRU 8 NOT TO EXCEED A FEE OF $36,800.00. <br />ENGINEERING SCOPE ASSUMPTIONS: <br />In developing this Scope of Services, ENGINEER represents to the INDIAN RIVER COUNTY <br />that the following assumptions have been made and that deviation from these assumptions may <br />require additional work and compensation on behalf of INDIAN RIVER COUNTY to the <br />ENGINEER. <br />1. This proposal specifically excludes all application and/or impact fees, which shall be the <br />responsibility of the INDIAN RIVER COUNTY. <br />2. This Scope of Services specifically excludes preparation of legal documents, easement <br />descriptions, structural, mechanical, electrical, landscape, and architectural work. <br />3. Preparation and submittal of a formal site plan to be reviewed and approved by the Indian <br />River County Technical Review Committee is not included. <br />4. Surveying for location of wetland or jurisdictional flagging is not included with this proposal. <br />5. Wetland planting design drawings and installation will be provided by others. <br />6. Permitting for disposal of any existing on-site hazardous or industrial waste material, or any <br />other underground, unforeseen issues is not included with this proposal. <br />7. It is understood that existing geotechnical soil testing has already been performed for this <br />project. Additional soil testing if required is not included in this proposal. <br />8. Construction stakeout and as-builts are not included with this proposal. <br />in 1 Fly oticla <br />N:1JHBIPROPOSALIJones Pier Wetland Restoration.doc Page 4 of 5 _ S_e_tvSince 191 y <br />02018 by CAI ' 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.