My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-092A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-092A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 2:09:55 PM
Creation date
6/14/2018 3:19:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
05/15/2018
Control Number
2018-092A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting, Inc.
Subject
43rd Avenue Bridge over IRFWCD South Relief Canal Railing Repair
Project Number
1523
Bid Number
2018043
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pale 3 of 3 <br />DISCUSSION <br />Questions & Answers <br />• James Ennis, Indian River County Engineer - explained that MOT will be a challenge. <br />This is a restricted/ narrow bridge, while traffic needs to be maintained. <br />• During removal of the bridge railing, the bridge cannot be opened to traffic with an <br />unshielded drop condition, the drop-off must be protected from traffic at the end of each <br />work shift. <br />• IRC Utilities has an aerial crossing attached to the bridge substructure on the western <br />side of the bridge. Care shall be taken during construction not to damage the pipe. <br />• Contractor is advised to choose epoxy from the FDOT approved material list, IRC will <br />expect the epoxy material to be submitted and the material can be verified by the Indian <br />River County. <br />• Tim Rose, Timothy Rose Contracting, Inc. — mentioned that the damaged post is <br />broken below the bridge deck. James Ennis responded that all broken and loose parts <br />shall be removed, cut flush and filled with epoxy for corrosion protection. <br />• James Ennis - IRC is planning to replace the bridge and this repair will be a short to <br />medium retrofit/ repair. <br />• Tim Rose, Timothy Rose Contracting, Inc. — asked if the Contractor has to have FDOT <br />Prequalification Work Class 13 — Guardrail or if the Subcontractor that will perform the <br />work can to be qualified. —Jennifer Hyde, Purchasing Manager responded that the <br />current documents show that the Bidder needs to have the Prequalification, but IRC will <br />clarify that requirement so that it is sufficient to have the subcontractor prequalified in an <br />addendum. <br />ATTACHED: <br />Sign In Sheet <br />HPublic Works\ENGINEERING DIVISION PROJECTSA523-43rd .Ave Bridee_S Rel Canal -Railing <br />Repair\Admin\BIDS\Moved from Const\Meetings\Pre-Bid Meeting\I523_Pre Bid Meeting Minutes_20180312.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.