My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-092A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-092A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 2:09:55 PM
Creation date
6/14/2018 3:19:15 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br />Estimate: $56,250.00 (includes force account) <br />Liquidated Damages: $958.00 per day <br />CONTACTS BIDDING PROCESS <br />All communications concerning this bid shall be directed to Indian River County Purchasing <br />Division at purchasing(@ircgov.com. <br />PROJECT CONSULTANTS: <br />Wantman Group, Inc. <br />UTILITIES <br />Indian River County Utilities <br />OTHER ISSUES <br />• Maintenance of Traffic: <br />o Contractor shall submit a Maintenance of Traffic Plan to the Indian River County, <br />Engineering Division for approval prior to commencing work. <br />o Traffic shall be maintained at all times. <br />o Bridge traffic without any traffic railing shall be limited to the work shift. <br />o The Maintenance of Traffic Plan shall meet the FDOT Index 600, FY2017-2018 <br />Edition and shall be signed and sealed by a Florida PE. <br />o Access for residences shall be maintained at all times. <br />o School buses, sanitation & US Postal Service must be maintained. <br />• Addendums if required — Bidders to review plan docs and provide comments to <br />Purchasing as soon as possible and within 5 business days following receipt of Pre -Bid <br />Meeting minutes. No further comments or questions 10 days prior to bid opening. <br />• Bidder must hold FDOT Prequalification Work Class 13 — Guardrail <br />Construction Drawings <br />• Sheet C-1— Cover sheet with the title "Railing Retrofit for: 43rd Avenue Bridge over South <br />Relief Canal" <br />• B-1 to B-5, - Drawings with title "Railing Retrofit for: 43rd Avenue Bridge over South Relief <br />Canal" <br />FDOT Standard Sheets (201 S) <br />• 400 Guardrail (Sheets 1-26) <br />• 470 Traffic Railing — (Thrie Beam Retrofit), General Notes and Details (Sheets 1-3) <br />• 475 Traffic Railing — (Thrie Beam Retrofit) Wide Curb Type 1 (Sheets 1-4) <br />PROJECT REQUIREMENTS: <br />Invoicing: One (1) invoice for lump sum items and measured quantities shall be <br />submitted for project upon completion. <br />Summary of required contractor form submittals checklist on Bid Form page 11 of 37 of <br />the "Invitation to Bid". <br />F:\Public Works\ENGINEERING DIVISION I'ROJECTS\1523-43rd Ave Bridge_S Rel Canal -Railing <br />Repair\AdminCBIDS\Moved from Const\MeetingsTre-Bid Meeting\1523_Pre Bid Meeting Minutes 20180312.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.