My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-108
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 11:58:41 AM
Creation date
6/15/2018 2:58:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/12/2018
Control Number
2018-108
Agenda Item Number
8.F.
Entity Name
Bowman Consulting Group, Ltd
Subject
Amendment1 to the existing Engineering Services Agreement
58th Avenue Pavement Reclamation
Area
57th Avenue to 85th Street/CR 510
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Attend Bid Opening Meeting as needed and address issues that arise during the <br />award process. <br />Task 03 — Construction Enaineerinp- Services <br />1. Review all relevant submittal documents including boring emergency procedures, <br />bentonite mix design, site layout plan, shop drawings, asphalt mix designs, materials tickets, and <br />any other submittals that may arise during the construction process. <br />2. Provide onsite inspections prior to construction on a part time basis including but not <br />limited to erosion control measures, site setup, emergency response measures, material <br />inspections and scheduling. <br />3. Provide part time inspection services during construction to include line stop <br />installation, fusion welding of the HDPE bore pipe, pressure testing, bore initiation and crossing <br />of 69`h Street including back reaming, construction sequencing and bypass coordination, and full <br />time onsite inspection during pullback to monitor downhole pressures and any onsite issues. <br />4. Provide onsite inspections of road widening including filling, grading, review of <br />compaction reports for imported fill for the proposed temporary road widening of 58a' Ave. Also, <br />provide engineering and string line evaluations of stabilized subgrade, base, and asphalt, <br />including onsite inspections during asphalt delivery and placement. Onsite inspection during <br />temporary striping installation <br />5. Site restoration inspection, including removal of line stops and bypass assemblies, <br />restoration of flows, and removal of temporary striping and traffic diversion. <br />Task 04 — Proiect Turnover <br />1. Review asbuilt survey for Utility Submittal, including updated bore profile <br />reflecting Contractor's bore log of the actual bore parameters, tie in locations, <br />locations of abandoned line stops and all other relevant information for a <br />complete and acceptable submittal to the Utility. <br />2. Perform Punch List evaluation and final walk-through of the project with Utility <br />Staff to verify substantial and final completion of the project. <br />3. Prepare and submit FDEP clearance documentation including clearance forms, <br />Bacteriological sampling results, and asbuilt drawings. <br />SERVICES AND/OR INFORMATION TO BE PROVIDED BY OTHERS <br />Client or others will provide the following services and/or information: <br />A. Maintenance of Traffic Design is to be provided by Others <br />Page 3 of 4 <br />C:\Users\rhickey\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\89D87TQ3\AMENDMENT <br />NO. l.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.