My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-108
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 11:58:41 AM
Creation date
6/15/2018 2:58:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/12/2018
Control Number
2018-108
Agenda Item Number
8.F.
Entity Name
Bowman Consulting Group, Ltd
Subject
Amendment1 to the existing Engineering Services Agreement
58th Avenue Pavement Reclamation
Area
57th Avenue to 85th Street/CR 510
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fees <br />Charge Associated withNew Total <br />This Amendment <br />Bowman Consulting Group ................................................... $45,608.00 <br />Lassiter Transportation Group ....................................................... $0.00 <br />BechtolEngineering and Testing ................................................... $0.00 <br />Evers Infrastructure Group............................................................. $0.00 <br />Ground Hound Detection Services ................................................. $0.00 <br />(ARCADIS) <br />Compensation <br />$252,154.00 <br />$129,560.00 <br />$50,360.00 <br />$3,000.00 <br />$8,280.00 <br />TOTAL LUMPSUMFEE............................................................... $45,608.00 $443,354.00 <br />Design Services <br />Task 01 — Design Services <br />Hydraulic and directional bore calculations for a 20" diameter waterline <br />relocation. <br />2. Design directional drill and pipe layout, design of construction sequencing and <br />12" temporary bypass assemblies to maintain service. <br />Design and detailed temporary road widening and striping to accommodate <br />construction of the waterline relocation. <br />4. Prepare technical specifications for directional drill, HDPE pipe and road <br />widening. Develop detailed bid schedule and bid descriptions and develop opinion of cost <br />matching the bid schedule. <br />Construction Services <br />Task 02 — Bid Services <br />Attend Pre -Bid Meeting and subsequent field visit as needed and address any <br />issues that may arise out of the meeting. <br />2. Respond to bid questions that arise during the bid process, prepare responses for <br />County issuance, and coordinate with County Staff for response tracking. <br />Page 2 of 4 <br />C: \Users\rhickey\AppData\Local\M icrosoft\W indows\INetC ache\C ontent.Outlook\89D 8 7TQ3\AMENDMENT <br />NO. l.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.