My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/05/2013AP-B
CBCC
>
Meetings
>
2010's
>
2013
>
11/05/2013AP-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:56:42 AM
Creation date
6/26/2018 10:57:03 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/05/2013
Meeting Body
Board of County Commissioners
Book and Page
195
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NT.tif
SmeadsoftID
14234
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Visit Preparation <br /> A letter will be sent to the recipient agency Point of Contact(POC)outlining the date,time and purpose of the site visit before the <br /> planned arrival date. <br /> The appointment should be confirmed with the grantee in writing(email is acceptable)and documented in the grantee folder. <br /> The physical location of any equipment located at an alternate site should be confirmed with a representative from that location and the <br /> address should be documented in the grantee folder before the site visit. <br /> On-Site Monitoring Visit <br /> Once FDEM personnel have arrived at the site,an orientation conference will be conducted. During this time,the purpose of the site <br /> visit and the items FDEM intends to examine will be identified.If financial monitoring visit will be conducted,they will then explain <br /> their objectives and will proceed to perform the financial review. <br /> FDEM personnel will review all files and supporting documentation. Once the supporting documentation has been reviewed,a <br /> tour/visual/spot inspection of equipment will be conducted. <br /> Each item should be visually inspected whenever possible. Bigger items(computers,response vehicles,etc.)should have an asset decal <br /> (information/serial number)placed in a prominent location on each piece of equipment as per recipient agency requirements. The serial <br /> number should correspond with the appropriate receipt to confirm purchase.Photographs should be taken of the equipment(large capitol <br /> expenditures in excess of$1,000.per item). <br /> [fan item is not available(being used during time of the site visit),the appropriate documentation must be provided to account for that <br /> particular piece of equipment. Once the tour/visual/spot inspection of equipment has been completed,the FDEM personnel will then <br /> conduct an exit conference with the grantee to review the findings. <br /> Other programmatic issues can be discussed at this time,such as missing quarterly reports,payment voucher/reimbursement,equipment, <br /> questions,etc. <br /> Post Monitoring Visit <br /> FDEM personnel will review the on-site monitoring review worksheets and backup documentation as a team and discuss the events of <br /> the on-site monitoring. <br /> Within 30 calendar days of the site visit,a monitoring report will be generated and sent to the grantee explaining any issues and <br /> corrective actions required or recommendations.Should no issues or findings be identified,a monitoring report to that effect will be <br /> generated and sent to the grantee. The grantee will submit a Corrective Action Plan within a timeframe as determined by the FDEM. <br /> Noncompliance on behalf of sub-grantees is resolved by management under the terms of the Sub grant Agreement. <br /> The On-Site Monitoring Worksheets,the monitoring report and all back up documentation will then be included in the grantee's file. <br /> All- 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.