My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-130
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 12:55:03 PM
Creation date
7/20/2018 2:00:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/17/2018
Control Number
2018-130
Agenda Item Number
8.D.
Entity Name
Masteller & Moler
Subject
Hobart Park Baseball Fields renovation
Amendment Number 1 to Work order Number 5
Project Number
IRC-1759
Document Relationships
2018-001
(Agenda)
Path:
\Official Documents\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M J MASTELLER & MOLER, INC. <br />M1 — CIVIL ENGINEERS <br />EXHIBIT A <br />165527 1h Stre <br />Ste. 2, Vero Beach, FL 32960 <br />(772) 567-5300 <br />As we have developed the designs for the Hobart Park Baseball Complex there are several changes <br />and/or additions to the scope of services and other designs that need to be completed to assure the <br />project will function properly upon completion. Our understanding is that we will provide the following <br />specific services: <br />Scope of Work: <br />Part I —Architectural Modification (by Donadio & Associates) <br />Revise floor plan and building elevation construction documents from a two-story structure to a <br />single -story structure as requested by the Owner. <br />Part II — Electrical & Mechanical Engineering (by Treasure Coast Engineering, Inc.) <br />Revise the electrical plans for the project to support the one (1) story structure. In addition, electric <br />power designs shall be provided for the project's irrigation system, sewage lift station, flagpole <br />lighting, scoreboard, and batting cage lighting. <br />Masteller & Moler, Inc. will coordinate with the electrical sub -consultant and the County to include <br />the additional electrical demands for the project onto the construction plans. <br />Part III — Irrigation Design (by Clark Irrigation Design & Consulting, Inc.) <br />Masteller & Moler, Inc. will perform research to determine the manner in which irrigation water is <br />to be provided to the project either by an onsite well or via the County's reuse water system. We <br />shall also provide an irrigation design to support the proposed new baseball fields and new <br />landscaped areas within the site. <br />Masteller & Moler, Inc. will also coordinate with Indian River County Department of Utility Services <br />to obtain a Utility Construction Permit for the proposed irrigation connection to the County's reuse <br />water system. This shall also include contacting the Florida Department of Environmental Protection <br />(FDEP) to confirm reuse water may be used as the source of irrigation as the Utilities Department <br />has existing potable water source wells on the site. <br />Fee Schedule: <br />Masteller & Moler, Inc. proposes to provide the above Scope of Services based on the following lump <br />sum fees: <br />Part I —Architectural Revisions $ 3,277.50 <br />Part II — Electrical / Mechanical Revisions $ 4,875.00 <br />Part III — Irrigation Design / Permitting $ 5,012.50 <br />Total: $ 13,165.00 <br />Time Schedule: <br />Amendment No. 1 shall be completed in 20 working days. <br />File#1756 <br />(Y:\mm\Projects\2017\1756 - Hobart Park Baseball Fields\ADMIN\Contracts\Amend No 1\1756_AmendNol_18-0702.docx) <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.