Laserfiche WebLink
INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />TO: Jason E. Brown <br />County Administrator <br />THROUGH: Richard B. Szpyrka, P.E. <br />Public Works Director <br />FROM: James D. Gray, Jr. <br />Natural Resources Manager <br />SUBJECT: Work Order No. 7 - Morgan & Eklund, Inc. <br />2018 Beach Profile Monitoring Surveys (SUMMER) <br />DATE: June 4, 2018 <br />DESCRIPTION AND CONDITIONS <br />On October 4, 2016, the Board approved a contract with Morgan and Eklund, Inc. (M&E) for <br />Professional Land Surveying and Mapping Services for a two-year term. The Board amended the <br />Contract on October 18, 2016. M&E is the selected County Consultant for professional <br />onshore/offshore hydrographic surveying services. <br />The County's Beach Preservation Plan recommends semiannual beach profile surveys in order to <br />monitor the seasonal, summer and winter, fluctuations of the beach. The proposed Work Order <br />No. 7 provides summer -time countywide hydrographic surveying (beach profile) services for the <br />Sector 3 and Sector 7 Beach Restoration Projects and additional surveying to complete a 2018 <br />countywide (22.4 miles) monitoring program. Additionally, the summer 2018 beach profile <br />surveys will provide a base line beach condition in the event of an active Hurricane season. All <br />onshore and offshore beach profile surveys are conducted along The Florida Department of <br />Environmental Protection (FDEP) Range Monuments at approximately 1,000 foot intervals <br />(alongshore) and extend from the vegetated dune seaward to a location approximately -40 feet <br />offshore (cross -shore). For project tracking purposes, Work Order No. 7 is divided into three (3) <br />separate tasks. <br />Task 1: Summer 2018 Sector 3 Beach and Dune Restoration Proiect Post Construction Monitorine <br />Survey (R -15-R-60) <br />By Permit, annual Post Construction hydrographic surveying is required to assess the <br />performance of the Sector 3 Beach and Dune Project area. Task 1 includes all surveying (7.5 <br />miles) required to complete the 2018 physical monitoring of the Sector 3 Beach and Dune Project <br />area. Task 1 totals a lump sum amount of $25,300. <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 54 <br />8\@BCL@CC38EAC3\@BCL@CC3 8EAC3.docx <br />