My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/25/1994
CBCC
>
Meetings
>
1990's
>
1994
>
10/25/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:27 PM
Creation date
6/17/2015 2:46:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/25/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bird, the Board unanimously <br />approved Change Order No. 2 with Speegle <br />Construction, Inc., and Addendum No. 1 with <br />Masteller and Moler, Inc., as presented in <br />stafffs memorandum. <br />CHANGE ORDER AND ADDENDUM <br />ARE ON FILE IN THE OFFICE OF CLERK TO THE BOARD <br />z. <br />PA4L 65LO, <br />91H COURT WATER LINE BETWEEN 41H AND 2ND STREETS <br />The Board reviewed the following memo dated October 14,.1994: <br />DATES OCTOBER 14, 1994 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />PROMS TEWNHENTAL <br />O <br />DIILITY SERVICES <br />PREPARED H.R <br />AND STAFFED ENENGINEER <br />BYS DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: 9TH COURT WATER LINE <br />BETWEEN 4TH AND 2ND STREETS <br />INDIAN RIVER COUNTY PROJECT NO. UW -94-11-D8 <br />BACKGROUND <br />Currently, most residents of 9th Court are on well and septic <br />tanks, and desire County potable water. In addition, fire <br />protection ie needed and will be provided by this project. <br />ANALYSI8 <br />In order to provide County water to the remaining residents of 9th <br />Court and to provide much needed fire protection, we propose to <br />construct a 6" and 4" water line with 4 accompanying services. <br />Since some of the residents of 9th Court are already on County <br />water or have been assessed through previous projects, it was <br />considered that a full assessment project would not be equitable to <br />the remaining residents. A line extension fee of $6.51 per linear <br />foot will be charged to those owners desiring water. <br />The staff of the Department of Utility Services recommends approval <br />of the -subject project at an estimated cost of $35,000. Design will <br />be in-house. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />--Commissioner Adams, ---the Board unanimously <br />approved -the 9th._Court Water Line project <br />between 4th and 2nd Street at an estimated <br />cost of $35,000, as recommended by staff. <br />90 <br />October 25, 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.