My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/25/1994
CBCC
>
Meetings
>
1990's
>
1994
>
10/25/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:27 PM
Creation date
6/17/2015 2:46:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/25/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Commissioner .,AdaLms, ,S.ECONDED by <br />Commissioner Bird, the Board unanimously. <br />- approved Work Authorization No. 26 with <br />- <br />Driveways, Inc., as set out - in staff's <br />memorandum. <br />AGREEMENT <br />IS ON FILE IN THE OFFICE OF CLERK TO THE BOARD <br />CR 510/U.S.#1 NORTH WATER MAIN PROTECT, CHANGE ORDER #2 <br />The Board reviewed the following memo -dated October 6, 1994: <br />DATE: OCTOBER 6, 1994 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PI <br />DIRECTOR OF UTILITY SERVICES <br />PREPARED WILLIAM F. MCCAIN <br />,AND STAFFED CAAPI T ,CTS ENGINEER <br />-BY: DEP FUTILITY SERVICES <br />SUBJECT: CR 510/US 1 NORTH WATER MAIN PROJECT <br />CHANGE ORDER NO. 2 <br />INDIAN RIVER COUNTY PROJECT NO. UW -93 -30 -DS <br />BACKGROUND <br />On July 5, 1994, the Indian River County Board of County <br />Commissioners approved a contract with Speegle Construction, Inc., <br />for the construction of the above -referenced project. As a result <br />of upcoming commercial development on.CR 510 east of US 1 and the <br />need for future water service to Marsh Island and the Environmental <br />Learning Center, the Utilities Department now would like to. <br />construct its Master -planned water service to this area. Due to the <br />low unit costs in this existing.contract, we feel that a change <br />order to this contract is the most expeditious and cost-effective <br />method -to accomplish the proposed construction. We are presenting, <br />for the Boards approval, an addendum to the existing work <br />authorization with Masteller and Moler, Inc., for design and Change <br />Order No. 2 with Speegle for construction of the afore -mentioned <br />line. <br />ANALYSIS <br />The original contract price with Speegle (including Change Order No. <br />1) was $1,111,458.75. The cost of the change order is $121,473.68 <br />(see attached Change Order No. 2). Also, please find attached <br />Addendum No. 1 in the amount of $14,575.00 with the consulting <br />engineer on this project. Approval of this addendum will bring the <br />total engineering services to $134,475.00, or approximately 10±%. of <br />the construction cost, which is well within acceptable limits for a <br />project of this nature and magnitude. <br />The staff of the Department of Utility Services recommends approval. <br />of Change Order No. 2 with Speegle Construction, Inc., and Addendum - <br />No. 1 with Masteller and Moler, Inc., as presented. <br />89 BOOK. t) ph" 515 <br />October 25, 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.