My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-131B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-131B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 1:07:40 PM
Creation date
8/20/2018 1:46:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/17/2018
Control Number
2018-131B
Agenda Item Number
8.I.
Entity Name
Community Asphalt
Subject
County Road 512 Resurfacing and Shoulder Widening
Contract Documents & Specifications
Area
Myrtle Street to 125th Avenue
Project Number
IRC-1305
Bid Number
2018-009
Alternate Name
CR 512
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.01 and 4.05. Paragraph 4.03 refers tuOWNER'o <br />identifying and making available CONTRACTOR <br />�ONT��O� <br />copies of reports of explorations and tests of <br />subsurface conditions and drawings of physical <br />conditions in or relating to anioUn0 surface or <br />subsurface structures adorcontiguous tothe Site that <br />have been utilized by ENGINEER in preparing the <br />Contract Documents. <br />8]08 Insurance <br />A. OWNER's responsibilities, if any, in respect to <br />purchasing and maintaining liability and property insur- <br />ance oveoetfodhinAdio|a5. <br />8.07 Change Orders <br />A. OWNER is obligated to execute Change <br />Orders ooindicated in paragraph 10.03. <br />8.08 Inspections, Tests, and Approvals <br />' <br />A. C}VVNER'o responsibility in respect to certain <br />inm000dons, tmoto,'and approvals in set forth in <br />paragraph 13.03.B. <br />8.09 Limitations on(}WVER's Responsibilities <br />A. The OWNER shall not supervise, direct, or <br />have control or authority over, nor be responsible for, <br />CONTRACTOR's means, methods, techniques, se- <br />quenoea.orprocedures ufconstruction, orthe safety <br />precautions and programs incident thereto, orfor any <br />tsi|una of CONTRACTOR to comply with Laws and <br />Regulations applicable to the pedbnnanoa of the <br />Work. OWNER will not be responsible for <br />CONTRACTOR'e failure to perform the Work in <br />accordance with the Contract Documents. <br />810 Undisclosed Hazardous Environmental <br />Condition <br />A. OWNER's responsibility in respect to an <br />undisclosed Hazardous Environmental Condifion is <br />set forth in paragraph 4.06. <br />811 Evidence ofFinancial Arrangements <br />A. If and to the extent OWNER has agreed to <br />furnish CONTRACTOR reasonable evidence that <br />financial arrangements have been made to satisfy <br />OVVNER'sobligations under the Contract Documents, <br />OWNER'e responsibility in respect thereof will be as <br />set forth inthe Supplementary Conditions. <br />ARTICLE 3 - ENGINEER'S STATUS DURING <br />CONSTRUCTION <br />9.01 OWNER'S Representative <br />A. ENGINEER will be[WNER's representative <br />during the construction period. The duties and <br />responsibilities and the limitations of authority of <br />ENGINEER as [WNER'o representative during <br />construction are set forth in the Contract Documents <br />and will not be changed without written consent of <br />OWNER and ENGINEER. <br />9.02 . Visits to Site <br />A. ENGINEER will make visits to the Site at <br />intervals appropriate tothe various stages ofconstruc- <br />tion as ENGINEER deems necessary in order to <br />observe as an experienced and qualified design <br />professional the progress that has been made and the <br />quality of the various aspects of COhTRACTOR'o <br />executed Work. Based on information obtained <br />during such visits and obaenmaUone. ENG|NEER, for <br />the benefit of [)VVNER, will determine, in general, if <br />the VVod« is proceeding in accordance with the Con- <br />tract Documents. ENGINEER will not be required to <br />make exhaustive orcontinuous inspections onthe Site <br />to check the quality or quantity of the Work. <br />ENG|NEER'a efforts will be directed toward providing <br />for OWNER a greater degree ofconfidence that the <br />completed Work will conform generally bzthe Contract <br />Documents. On the basis of such visits and <br />observations, ENGINEER will keep OWNER informed <br />ofthe progress ofthe Work and will endeavor toguard <br />OWNER against defective Work. <br />B. ENG|NEER's visits and observations are <br />subject to all the Um��neonENG|NEER� authority <br />and responsibility set forth in paragraph 9.10. and <br />particularly,but without limitation, during oraaaresult <br />of ENE;|NEER'm visits or observations of <br />C[}NTRACTOR's Work ENGINEER will not <br />supervise, direct, control, orhave authority over orbe <br />responsible for CONTRACTOF1'n rnoons. ,nethodo, <br />techniques, sequences, or procedures of construction, <br />or the safety precautions and programs incident <br />thereto, orfor any failure ofCONTRACTOR bocomply <br />with Laws and Regulations applicable to the <br />performance ofthe Work. <br />9.03 Project Representative <br />A. If OWNER and ENGINEER agree, ENGI- <br />NEER will furnish a Resident Project Representative <br />to assist ENGINEER in providing more extensive <br />observation of the Work. The responsibilities and <br />00700 - General Conditions REV 5-10-13 <br />00mo-28 <br />F:Tublic WorkMENGINEERING MISION PROJECTS\1305-CR512pesurf (SCOP)_Myrtlemm`25th St\Admim\bid documents\Master Contract Documents%00700'General Conditions <br />
The URL can be used to link to this page
Your browser does not support the video tag.