Laserfiche WebLink
performed bvutility owners. Ifsuch other work is not <br />noted in the Contract Documents, then: <br />1. written notice thereof will be given to <br />priorCONTRACTOR to staffing any such other <br />work; and <br />3. if OWNER and CONTRACTOR are <br />unable to agree on entitlement to or on the <br />amount orextent, if any, ofany adjustment in <br />the Contract Phca or Contract Times that <br />should be allowed as o result of such other <br />work, a Claim may be made therefor as <br />provided inparagraph 1O.D5. <br />B. CONTRACTOR shall afford each other <br />contractor who ksaparty tmsuch adirect contract and <br />each utility owner (and OWNER, if OWNER is per- <br />forming the other work with {DWNER'e employees) <br />proper and aofa access hothe Site and a reasonable <br />opportunity for the introduction and storage of <br />rnsdeho|m and equipment and the execution of such <br />other work and shall properly coordinate the Work with <br />theirs. Unless otherwise provided in the Contract <br />Documents, CONTRACTOR shall do all outUng, <br />fittinQ, and patching of the Work that may be required <br />to properly connect or otherwise make its several <br />parts come together and properly integrate with such <br />other work. CONTRACTOR shall not endanger any <br />mmrh of others by outUng, enoavadng, or otherwise <br />altering their work and will only cut or alter their work <br />with the written consent ofENGINEER and the others <br />whose work will be affected. The duties and <br />responsibilities of CONTRACTOR under this <br />paragraph are for the benefit ofsuch utility owners and <br />other contractors to the extent that there are <br />comparable provisions for the benefit of <br />CONTRACTOR in said direct contracts between <br />OWNER and such utility owners and other <br />contractors. <br />C. If the proper execution or results of any part of <br />CONTRACTOR's depends upon work per- <br />formed by others under this Article 7, CONTRACTOR <br />er-fonnmdbvothnrounderthkaArdcle7.CONTRACT{JR <br />shall inspect such other work and pnonnody report to <br />ENGINEER inwriting any delays, defects, ordefiden- <br />cies in such other work that render it unavailable or <br />unsuitable for the proper execution and naouKa of <br />CONTRACTOR,s Work. CONTRACTOR'a failure to <br />mo report will constitute an acceptance of such other <br />work as ft and proper for integration with <br />CONTRACTOR's Work except for latent defects and <br />deficiencies insuch other work. <br />7.02 Coordination <br />A. If OWNER intends to contract with others for <br />the performance of other work on the Project at, the <br />Site, the following will beset forth in Supplementary <br />1. the individual orentity who will have <br />authority and responsibilityfor coordination of <br />the activities among the mahouscontractors will <br />be identified; <br />2. the specific matters tobocovered by <br />such authority and responsibility will be <br />itemized;. and <br />3. the extent of such authority and <br />responsibilities will be provided. <br />B. Unless otherwise in the <br />Supplementary Conditions, OWNER ahm|| have sole <br />authority and responsibility for such coordination. <br />ARTICLE B -OWNER'S RESPONSIBILITIES <br />8.01 Communications to Contractor <br />A. Except as otherwise provided in these <br />General Conditions, OWNER shall issue all communi- <br />cations toCONTF0\CTORthnoughENGINEER. <br />8.02 Replacement of ENGINEER <br />A. In case of termination of the employment of <br />ENGINEER, [%A/NER| shall appoint on engineer to <br />whom CONTRACTOR nmohaa no reasonable <br />objecton, whose status under the Contract <br />Documents shall bethat ofthe former ENGINEER. <br />8.03 Furnish Data <br />A. OWNER shall promptly furnish the data <br />required ofOWNER under the Contract Documents. <br />8.04 Pay Promptly When Due <br />A. OWNER shall make payments toCONTRAC- <br />TOR promptly when they are due as provided in <br />paragraphs 14.O3.0and 14.O7.C. <br />8.05 Lands and Easements, Reports and Tests <br />A. OVVNER'oduties \nrespect ofproviding lands <br />and easements and providing engineering surveys to <br />establish reference points are set forth in paragraphs <br />00700 - General Conditions REV 5-10-13 <br />00700-27 <br />FAIDublic WorkslENGINEERING DIVISION PROJECTS\1 305-CR512Resurf (SCOP)_Myrtle St to 125th ShAdmirrikbid documents%Master Contract DocumentsN00700'General Conditions <br />