My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-131B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-131B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 1:07:40 PM
Creation date
8/20/2018 1:46:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/17/2018
Control Number
2018-131B
Agenda Item Number
8.I.
Entity Name
Community Asphalt
Subject
County Road 512 Resurfacing and Shoulder Widening
Contract Documents & Specifications
Area
Myrtle Street to 125th Avenue
Project Number
IRC-1305
Bid Number
2018-009
Alternate Name
CR 512
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2 PERMITS <br />A. The OWNER has obtained certain permits for this project and they are listed in <br />paragraph 6.08.13 of the EJCDC Standard General Conditions of the Construction <br />Contract (General Conditions). Per paragraph 6.08.0 of the General Conditions, <br />apply for and obtain all other required federal, state, and local permits, licenses, <br />sampling, and tests. <br />B. Provide copies of all approved permits to the OWNER and ENGINEER and comply <br />with all conditions contained in all permits at no extra cost to the OWNER. If there <br />is a conflict between any permit requirement and these Specifications or <br />requirements between permits, the more stringent specification or requirement <br />shall govern. <br />C. Pay for all required water quality sampling and laboratory tests. <br />1.3 GENERAL <br />A. Do not begin any other construction work until the pollution control and treatment <br />system has been constructed in accordance with approved plans, permits, and <br />these Specifications; and the installed system has been examined by the OWNER <br />for compliance. <br />B. From time to time, the OWNER or ENGINEER will inspect the pollution control and <br />treatment system and may take effluent samples for analysis by a testing <br />laboratory selected and paid for by the OWNER. If at any time, the OWNER or <br />ENGINEER determines that the pollution control and treatment system is not in <br />compliance with the approved system, the OWNER or ENGINEER will shut the <br />portion of the project down that is not in compliance, and it shall remain shut -down <br />until the pollution control and treatment system is properly constructed or repaired, <br />and complies with the approved pollution control and treatment system plans, <br />specifications, contract documents, and permits. <br />C. Schedule construction to minimize erosion and stormwater runoff from the <br />construction site. Implement erosion control measures on disturbed areas as soon <br />as practicable in portions of the site where construction activities have temporarily <br />or permanently ceased, but in no case more than 7 days after the construction <br />activity in that portion of the site has temporarily or permanently ceased. In <br />addition to other temporary erosion control measures that may be implemented, <br />application of polyacrylamide is required on all such disturbed areas within 7 days <br />after the construction activity in that portion of the site has temporarily or <br />permanently ceased, unless final landscaping has been installed. Polyacrylamide <br />application shall be as specified herein. Include polyacrylamide application in the <br />Project's SWPPP. <br />D. Inspect each pollution control system at least once per day and after each rainfall <br />event. Clean and maintain each pollution control system as required until the <br />system is no. longer needed. If a water quality violation occurs, immediately cease <br />all work contributing to the water quality violation and correct the problem. <br />Immediately report all water quality violations to the OWNER. Immediately report <br />01025-5 Technical Specifications <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1305-CR 512 Resurf (SCOP) Myrtle St to 125th St\Admim\bid <br />documents\Master Contract Documents\Technical Specifications - 100% Submittal - Rev 02 11-06-17.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.